Project based on Andon board is a digital screen that can be used to monitor production,flight arrival/departure at airport etc. This is designed by using nextion HMI, arduino node MCU and a wifi module. A coonveyer is attached tto limit switch to measure the count of the product.
smart andon board cost effictive
Project based on Andon board is a digital screen that can be used to monitor production,flight arrival/departure at airport etc.
This is designed by using nextion HMI, arduino node MCU and a wifi module. A coonveyer is attached tto limit switch to measure the count of the product.
This is an IOT based system by which the screen can be accessed anywhere with in the industry limit. This device is cost effective and is a big need of local industries.
phase 1- read the topic and making summary
phase-2 calculate the project budget and beneift
phase -3 working on harware System.
phase-4 working on implementation of software system
Phase-5 Finally Check the project .and ready to present it
Follwing are a few benfits of this project.
In the final deleriable, we need to present and demontrate the live working of the project.some of the technical deatils are as follows.
1-when the product touch the limit switch its counting product
2- target set on screen and iot base
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| nextion | Equipment | 1 | 14500 | 14500 |
| ardino node mcu | Equipment | 1 | 800 | 800 |
| Usb to TTL Convertor | Equipment | 1 | 600 | 600 |
| 5v charger | Equipment | 1 | 500 | 500 |
| conveyor | Equipment | 1 | 4000 | 4000 |
| limit switch | Equipment | 1 | 500 | 500 |
| ardino uno | Equipment | 1 | 500 | 500 |
| c programming learning | Miscellaneous | 1 | 3000 | 3000 |
| Total in (Rs) | 24400 |
Our final year project is focused on Fleet Management System. Fleet managment system&...
During the time of Covid-19 whole world was in great crisis and many businesses were shut...
The Project ?Web-Based Timetable Designer?, will help the departments to create timetables...
Landslides are one of the major destructive disasters, caused by geological, horological&n...
The project is to make a mobile-based application system where diabetic patients mainly, p...