Wind Turbine Emulator

A wind turbine emulator (WTE) is imperative equipment for the development of wind energy conversion systems (WECS). This emulator imitates steady-state and dynamic characteristics in a controlled environment without dependence on natural wind resources and actual wind turbines, for the purpose of co

2025-06-28 16:36:47 - Adil Khan

Project Title

Wind Turbine Emulator

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

A wind turbine emulator (WTE) is imperative equipment for the development of wind energy conversion systems (WECS). This emulator imitates steady-state and dynamic characteristics in a controlled environment without dependence on natural wind resources and actual wind turbines, for the purpose of condition monitoring of wind turbine (WT)

Project Objectives

The main objective is the development of low-cost WTE for a stand-alone wind energy conversion system. Which can be used to analyze and assess the performance of Wind Energy Conversion System (WECS).

Project Implementation Method

A separately excited DC motor is deployed in order to reproduce the speed/torque, replacing the real wind turbine rotor and we are controlling the speed of Dc motor by using a driver circuit. Then after DC motor we are using the Three-Phase induction motor as a generator which will help us to convert mechanical energy into electrical but this energy will be in three phase. The three-phase full -bridge rectifier is used to convert that alternating in to direct current.  A user interface will be created using Deckcard through which the input parameters of the WTE can be altered in real time and the instantaneous effect can be observed by analyzing the output parameters

Benefits of the Project Technical Details of Final Deliverable

Wind turbine will be able to produce voltages at the generator side by varrying the speed of motor accordingly.The basic hardware consist of DC motor,AC induction motor,ac load and a driver circuit which can be easily install in lab and ver  cost effective as its prize estimation ranged from 40K to 50K.it will be able to minimize power losses that occur due to varrying wind speed.

Final Deliverable of the Project HW/SW integrated systemCore Industry Energy Other IndustriesCore Technology OthersOther Technologies Clean TechSustainable Development Goals Affordable and Clean EnergyRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 41000
DC motor Equipment170007000
Three phase induction motor/generator Equipment11500015000
Microcontroller Equipment150005000
rectifier Equipment120002000
transformer Equipment070000
DC driver Circuit Equipment120002000
xyz Miscellaneous 11000010000