Adil Khan 1 year ago
AdiKhanOfficial #FYP Ideas

Whitehat keepers

In this technology driven world there is lots of frauds IP infringement and malware occurs cyber security is important because it encompasses everything that relates to protecting the data from attackers who want to steal the information. Breaching into their data e.g. banking, immigration sites, he

Project Title

Whitehat keepers

Project Area of Specialization

Cyber Security

Project Summary

In this technology driven world there is lots of frauds IP infringement and malware occurs cyber security is important because it encompasses everything that relates to protecting the data from attackers who want to steal the information. Breaching into their data e.g. banking, immigration sites, healthcare sites.  There is no specific tool that can manage the cyber professional’s work and researches at one place. We are developing a management suite for independent security researchers, ethical hackers, bug bounty hunters, cyber security professionals to help them maintaining their activities like scope, bounty, credentials, restrictions and limitation. Therefore they can record and track their projects.

Project Objectives

  • Chat among team members
  • Team dashboard
  • Record and track projects

Project Implementation Method

We will implement our project through waterfall model. Phases of implemented method as follows:

  1. Requirement gathering and Analysis: All possible requirements of the system to be developed are captured in this phase and documented in a requirement specification document.
  2. System Design: The requirement specifications from first phase are studied in this phase and the system design is prepared. This system design helps in specifying hardware and system requirements and helps in defining the overall system architecture.
  3. Coding / Implementation: With inputs from the system design, the system is first developed in small programs called units, which are integrated in the next phase. Each unit is developed and tested for its functionality, which is referred to as Unit Testing.
  4. Integration and Testing: All the units developed in the implementation phase are integrated into a system after testing of each unit. Post integration the entire system is tested for any faults and failures.
  5. Deployment of system: Once the functional and non-functional testing is done; the product is deployed in the live environment.

System Architecture Daigram:

Benefits of the Project

The benefit of this project is to provide a management system for Cyber security professional. The application will manage and store data which will help them during Penetration Testing networks and Application. The application can be use if users want to collab and share information.

Technical Details of Final Deliverable

  • Complete Working Software / Application
  • Source Code 
  • Software Documentation
  • User Manual

Final Deliverable of the Project

Software System

Core Industry

Security

Other Industries

IT

Core Technology

Cloud Infrastructure

Other Technologies

Sustainable Development Goals

Decent Work and Economic Growth

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Domain Miscellaneous 150005000
Hosting Miscellaneous 120002000
SSL Certificate Miscellaneous 130003000
Total in (Rs) 10000
If you need this project, please contact me on contact@adikhanofficial.com
0
152
E Services Finder and Provider App

Online Home Service platform The platform helps customers book reliable & high quality...

1675638330.png
Adil Khan
1 year ago
Smart Robot Mapping and Path Planning using Augmented Reality

In this age of robotics and automation, revolutionary progress is observed by incorporatin...

1675638330.png
Adil Khan
1 year ago
Design and Implementation of Transformerless Grid-Tie Inverter

In recent years, concerns regarding climate change and global warming have resulted in a d...

1675638330.png
Adil Khan
1 year ago
IDE for Vehicular Traffic Simulation

In this R&D based project an IDE namely, Vehicular Traffic Simulator (VTS) would be de...

1675638330.png
Adil Khan
1 year ago
Design and development of Heat Sinks for high speed microprocessor ba...

In the present Era microprocessors are part of every high-performance electronic equipment...

1675638330.png
Adil Khan
1 year ago