Solid Waste Management

Garbage collection and management is a crucial problem faced by every nation due to a number of factors. On the other hand, it is so important because every human in the world is generating waste every moment. We can automate this process using cutting-edge technologies like the Internet of Things (

2025-06-28 16:29:37 - Adil Khan

Project Title

Solid Waste Management

Project Area of Specialization Internet of ThingsProject Summary

Garbage collection and management is a crucial problem faced by every nation due to a number of factors. On the other hand, it is so important because every human in the world is generating waste every moment. We can automate this process using cutting-edge technologies like the Internet of Things (IoT) and Artificial Intelligence models.

One of the main concerns with our environment has been solid waste management which in addition to disturbing the balance of the environment also has adverse effects on the health of the society. The detection, monitoring, and management of waste are one of the primary problems of the present era. the process of making things automatic is being exploited in almost all the major fields of life. Solid waste which is one of the sources and causes of environmental pollution has been defined under the Resource Conservation and Recovery Act as any solid, semi-solid liquid, or contained gaseous materials discarded from industrial, commercial, mining, or agricultural operations and from community activities.

Project Objectives

Making Alert in case of 2-3 hours of the 1st notification if the container is still full

Project Implementation Method Benefits of the Project

In this Modern Era, the solid waste management system is manual due to which contains a lot of problems in proper management while collecting solid waste. On the other hand, the existing system has human involvement due to which the system is inefficient and not reliable. These problems are increasing parallel to each other so these must be addressed in parallel to completely overcome this kind of problem. If we are able to do this, we can:

Technical Details of Final Deliverable

As the project consists of two main operational units i.e. Training model to classify the filled and empty container and sending the reports and notifications to the end-users. So, based on this we have divided our whole project into two major milestones:

Our focus is to complete this module before the end of the 7th semester, so we have roughly 3 months for it.

Our focus is to complete this module at the start of next semester (8th Semester).

Final Deliverable of the Project HW/SW integrated systemCore Industry OthersOther IndustriesCore Technology Internet of Things (IoT)Other TechnologiesSustainable Development Goals Climate ActionRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 61020
Arduino Uno Equipment1885015300
Ultrasonic-Sensor(HC-SR04) Equipment7216011520
GSM Module(SIM800L-G54) Equipment1880014400
GPS(GPSNEO-B117) Equipment1895017100
Breadboard Equipment181502700