Scheduling of parts to improve value aided work in process in manufacturing industry

Our project is on scheduling of parts to improve value aided work in process in manufacturing industry.Scheduling is basically the process of arranging controlling and optimizing the work and work loads in manufacturing process and production process.In manufacturing the purpose of scheduling is to

Project Title

Scheduling of parts to improve value aided work in process in manufacturing industry

Project Area of Specialization

Mechanical Engineering

Project Summary

Our project is on scheduling of parts to improve value aided work in process in manufacturing industry.Scheduling is basically the process of arranging controlling and optimizing the work and work loads in manufacturing process and production process.In manufacturing the purpose of scheduling is to minimize the production time and cost.So our project is on to improve value aided work in process.Basically the value aided work in process is the partially completed goods which are typically turn from raw material to finished product.The industry which I selected is spark packages industry. It manufacture cardboard and corraughted boxes. Then we applied the different dispatching rules and  also different algrothm such as NEH algrothm.So by doing this we reduce the makspan and also improve value aided work in process.

Project Objectives

Some objective of our project are:

Optimize value aided work in process.

Reduce cost associated with value addition.

Achieve the customer demand.

Project Implementation Method

I selected the spark packages industry and we reduce the value aided work in process So by using the different tools and software we reduce the makspan and also we achieve our objective and then we implement on the industry.

Benefits of the Project

The benefit of our project is that company will save a a lot of money that by reducing the makspan and achevie the customer demand.

Technical Details of Final Deliverable

By using different tolls we make the model and also these models are applicable on every industry just by changing the processing time.

Final Deliverable of the Project

Software System

Core Industry

Manufacturing

Other Industries

Core Technology

Shared Economy

Other Technologies

Sustainable Development Goals

Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Mathematica software license Equipment13060030600
MATLAB software license Equipment11782017820
SIMIO sotware Equipment147004700
Printer Equipment150005000
Different gadget for measuring transportation time and process time. Equipment320006000
Others Miscellaneous 215003000
Total in (Rs) 67120
If you need this project, please contact me on contact@adikhanofficial.com
0
283
D punching Boxing game with Voice Recognization

PUNCH BOXING 3D with voice recognised system is a unity-based game for PC. We are tr...

1675638330.png
Adil Khan
1 year ago
Rappel: Location Based Smart Reminders

We often forget tasks that we?ve to do on our way, for e.g. buying groceries while returni...

1675638330.png
Adil Khan
1 year ago
Autonomous and Portable sun-tracking solar energy harnessing system

An Autonomous and Portable sun-tracking solar energy harnessing system, is a power system...

1675638330.png
Adil Khan
1 year ago
Electronic Portfolio for University Employee Career Promotion and Stud...

Career promotion is considered to be a blessing by an employee serving in an organization....

1675638330.png
Adil Khan
1 year ago
RentX

Consumer goods are being disposed of, overproduced and underutilized. 1 ) High Initial Co...

1675638330.png
Adil Khan
1 year ago