Adil Khan 9 months ago
AdiKhanOfficial #FYP Ideas

Run off the river water turbine

Electricity is the basic and neediest thing every human being in the world desires. A person can stay without it for a day, two or even three but after that, there is still a need and demand for it since no one can withstand without it.   Most of the people in the world use an e

Project Title

Run off the river water turbine

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

Electricity is the basic and neediest thing every human being in the world desires. A person can stay without it for a day, two or even three but after that, there is still a need and demand for it since no one can withstand without it.

Most of the people in the world use an easy approach to get electricity in their homes, shops, workplace, etc by purchasing it. Then a question arises in minds of many few to make their own. The cheapest electricity can be made through renewable energy like sun, water, gases and much more.

Our turbine makes electricity through water which is one of the cleanest and cheapest source with some initial cost and giving a lifetime supply of continuous electricity. The high streams of water flowing in different parts of the world don't really stop at any instance and as compared to the sun there is some particular time of generation. Having a type of machine which produces the cleanest energy through flow of the water is very essential to be in the market.

Project Objectives

The objectives of the project is going to be comprised in a way that our main motive is to generate electricity through the flow of the water. Following are some of the objectives which we are aiming to achieve:

- To provide constat supply of 220 Volt AC.

- To generate electricity without polluting environment.

- Generation of electricity on a very minimal flow. 

- To maintain constat DC output voltage through voltage controller/regulator.

Project Implementation Method

The implementation method is going to be in a way that our project is going to be installed in those areas having a certain water flow. 

Like, in Karachi there is a great sewage system present but since it is only used for carrying waste its water flow is not been utilized. Having a zero debris design, the turbine can surprass any solid waste from it. So our approach is also to implement there. to utilize that flow for the production of electricity.

Areas having extensive water flow like those present in Northern side consist of natural flow that is been coming from the mountains. 

Artificial water flow can also be created through implementing our turbine on big tanks present usually on flats, banglows etc. Since there is a flow, so our turbine can work efficiently even there too.

  

Benefits of the Project

The benefits associated with our project are:

- Requires only initial investment.

- Gives a continuous supply of electricity.

- Low operational cost, battery bank only needs to be changed one time in a year.

- No or very less running cost.

- The flow of the river is constant.

- It doesn't require any labor to look into it on a daily basis.

- The machine is shipped in parts, so if any part is damaged in the future it can be replaced easily.

- It does not pollute the environment.

- It does not kill marine life due to debris structure.

- Material used in the machine is very rigid and long-lasting (Stainless Steel/Aluminium)

Technical Details of Final Deliverable

24 vDC outuput is going to be generated from the turbine which is going to be fed at voltage/charge controller which will charge the battery(rating depending on user demand)

Then we will provide AC transmission through inverter which is dependent on battery bank.

So basically, depending on load report the rating of battery bank and inverter is going to be decided.

Final Deliverable of the Project

Hardware System

Core Industry

Energy

Other Industries

Education , Manufacturing , Others

Core Technology

Clean Tech

Other Technologies

Others

Sustainable Development Goals

Good Health and Well-Being for People, Affordable and Clean Energy, Decent Work and Economic Growth, Industry, Innovation and Infrastructure, Climate Action, Life Below Water, Partnerships to achieve the Goal

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
motor Equipment12000020000
motor body and blades Equipment6600036000
charge controller Equipment170007000
battery bank Equipment160006000
wires, bolts & etc Miscellaneous 11000010000
Total in (Rs) 79000
If you need this project, please contact me on contact@adikhanofficial.com
medhope

This project basically covers all aspects/types of medicines which are not in use and will...

1675638330.png
Adil Khan
9 months ago
A photovoltaic based smart and portable street lightening system

We need to save or conserve energy because of most of the energy sources we depend on, lik...

1675638330.png
Adil Khan
9 months ago
An Automated Content Base Facial Image Retrieval using Conventional Ne...

With the development of multimedia technology, the rapid increasing usage of wild image da...

1675638330.png
Adil Khan
9 months ago
AutoBoat

In this era of automation where cars are driving without a driver, where drones are flying...

1675638330.png
Adil Khan
9 months ago
The Smart Evaluator

The Smart Evaluator is a android and desktop application to automate the quiz system. The...

1675638330.png
Adil Khan
9 months ago