And all the inventory is being managed manually which is a way slow and imperfect solution for the inventory in warehouses. Barcodes have to be implemented manually and there are a lot complications with them. Our goal is made the warehouses management system way smarter a
RFID Based Warehouse Management system
And all the inventory is being managed manually which is a way slow and imperfect solution for the inventory in warehouses.
Our goal is made the warehouses management system way smarter and more efficient than old method by using RFID tags, scanners and desktop application for inventory. In this approach all the products, pallets and storage Bins will be tagged by RFID tags. Whenever the stock will enter the warehouse it will be automatically detected by the Scanners and will send all the stocks’ information to inventory application which will make stock management and tracking a lot easier in useful manners.
Use of IOT and Desktop application for inventory management.
We have different parts in our project
1-Desktop App:
All the information about the products and stock is stored in the RFID tags and is collected by the scanners and then that information is send to the inventory desktop application. There are some categories in the application like product details stock management, Bin management, Customers details, sales and purchases, which are managed through the application.
2-Hardware module:
We are using RFID tags applied to the all the management areas like products, pallets, Bins, shelves and the information is added to their memory. RFID scanners are placed from where the products will be added or moved; scanners will automatically detect the tags and send information to the inventory.
| Requirements | Analysis | Design | Coding | Testing | Operations |
| Month 1 Month 2 Month 3 | Month 4 | Month 5 & 6 | Month 7 & 8 | Month 9 | Month 10 |
| Research Model Design & Development Model Evaluation Hardware Components | Model Verification Hardware Assembling | Design & Code interface Hardware integration | Design & Code System Hardware Connectivity | System Testing | System Verification |
Requirements
Month 1
Month 2
Month 3
Research
Model Design & Development
Model Evaluation
Hardware Components
| Elapsed time in (days or weeks or month or quarter) since start of the project | Milestone | Deliverable |
|---|---|---|
| Month 1 | Research | Requirements and details |
| Month 2 | Model Design and Development | Desktop Application |
| Month 3 | Model Evaluation &Hardware Components | Results of evaluation and hardware |
| Month 4 | Model Verification | Verified Model |
| Month 5 | Hardware Assembling | Hardware connectivity |
| Month 6 | Design & Code interface | Implemented Design |
| Month 7 | Hardware integration | Connectivity with Application |
| Month 8 | Design & Code System | Implemented System |
| Month 9 | System Testing | Results of testing |
| Month 10 | System Verification | Verified System |
Science and Technology is modifying the globe by time to time. Along with optimizing other...
Project Summary: A standalone waste to energy plant that demonstrates the modeling of a no...
In this project, a glass wall cleaning robot climbs on the vertical glass wall surface. To...
?AutoSecure? System will provide a platform where the firearms of unauthorized persons are...
Piezoelectric accelerometer, when subjected to vibration converts mechanical energy into &...