Project Title

Railway traffic accident detection and prevention system

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

Recent advances in various technologies have introduced new effective systems that can be successfully used in a number of future rail operations and applications, including those in safety features. Rail accidents are a major problem in the transportation industry in many countries. There is an urgent need to install protective elements to prevent accidents. This project describes the design and implementation of the train safety system. The system has two stages accident detection and prevention.
The first phase contains the system containing the sensors, GPS system, controller, and a GSM module. The second phase, for accident prevention, we will automate the junction gates to prevent any misadventure.

Project Objectives

Our project’s main objectives are:

  1.  Monitoring of train speed using sensors when approaching the crossing.
  2.  Installation of GPS module on the train.
  3.  Placement of sensors on track for train detection.
  4. LCD display at crossing to provide train information, like distance, speed, and direction.
  5. Installation of automatic motorized gates at the railway crossing.
  6. Transmission of train location using GSM to the control room.

Project Implementation Method

Arduino UNO and Atmega microcontrollers are used for implementation. In our project, we are controlling the automatic opening and closing of level crossing gates by microcontroller. Ultrasonic Sensors along the railway track for the detection of train, we are using traffic light indicators, buzzer and LCD to display the required information. GPS and GSM module along with Arduino UNO are placed on the train to keep tracking the speed, distance, and direction.

Benefits of the Project

Following benets society can take from our project:

• More reliable because machines cant be bribed.
• More user-friendly.
• This system can be implemented at every railway crossing.
• Less human interference.
• More preventive from accidents as compared to manual systems.

Technical Details of Final Deliverable

The technical details for our project are the following:

  1. Firstly, we are detecting the train using ultrasonic sensors which works in such a way that the train is detected by fixing the RTT(round trip time).
  2. Then we are taking information from GPS modules like train speed, location, and direction.
  3. Then we are installing the GSM module on train for communication to the control room which works on 5v DC power.
  4. We implemented a motorized gate at a level crossing which will automatically open and close depending upon the condition. This gate is driven by a DC motor that operates on 12v.
  5. Installing GSM module at level crossing for two way communication.
  6. Led bulbs are installed at level crossing that operates on 12v DC as traffic light indicators.
  7. We are using an alarm that works on 220v AC voltage that will sound when train approaches the crossing.

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Security

Other Industries

Others

Core Technology

Others

Other Technologies

Others

Sustainable Development Goals

Decent Work and Economic Growth, Industry, Innovation and Infrastructure, Sustainable Cities and Communities

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Arduino UNO Equipment28001600
Arduino MEGA Equipment215003000
GSM module Equipment322006600
GPS module Equipment213002600
Ultrasonic sensor Equipment81701360
LED Bulbs Equipment4100400
Holder Equipment440160
Bell Equipment2450900
16x2 LED Equipment2400800
DC Motor Equipment210002000
Mechanical Structure Equipment11500015000
Weiro Board Equipment2100200
Wires Equipment120101200
Relays Equipment5170850
Total in (Rs) 36670
If you need this project, please contact me on contact@adikhanofficial.com
Part Detailing of an EV three Wheeler along with FES

The title of our project is the ?Part Detailing of an EV 3 Wheeler?. The premise of this p...

1675638330.png
Adil Khan
9 months ago
grid synchronized photovoltaic system

The aim of this project is to design a system that is cost effective and synchronize...

1675638330.png
Adil Khan
9 months ago
Smart Milk Packaging Machine

Pakistan is the 4th largest producer of milk in the world but unfortunately, we are contin...

1675638330.png
Adil Khan
9 months ago
Design and Implementation of Fuzzy Logic Flight Controller for a Quad...

Over the past few years, Unmanned Aerial Vehicles (UAVs) have become the main element in A...

1675638330.png
Adil Khan
9 months ago
Automatic Fire Detection Robot

This Project Is About Fire Fighting And This System Is Use To Detect Fire Extinguish...

1675638330.png
Adil Khan
9 months ago