Railway Track Monitoring using WSSN and Cloud Networking

Now a days the tools that are used to monitor railway tracks specially at crossings are ineffective. Routine inspections of the railway tracks  are still being performed manually or  by specially designed inspection vehicle which creates higher expenditure and make

Project Title

Railway Track Monitoring using WSSN and Cloud Networking

Project Area of Specialization

Internet of Things

Project Summary

Now a days the tools that are used to monitor railway tracks specially at crossings are ineffective. Routine inspections of the railway tracks  are still being performed manually or  by specially designed inspection vehicle which creates higher expenditure and makes infrastructure difficult to maintain. This project aims to design a real time system based on acceleration measurements (IMU sensors). With the help of wireless sensor network (WSN), data will be logged from the sensors and will be send over the cloud platform where the data processing will be performed. The data will be processed in such a manner that it can detect any abnormality including squats and frogs if found on track.This projects will be cost effective with accurate and precise measurements which results in good performance. Hence it will help the railway industries to monitor the railway track efficiently and accurately.

The flow chart below described an overview of  project:-

Project Objectives

The main objective of our project is to overcome the accidents such as derail caused by malfunctioning of Railway track.

To achieve the main objective we have sub divided into three objectives which are listed below:-

Objective #1: To measure the necessary parameters of track which are responsible for railway accidents.

Objective # 2: After measuring the track parameters we will process that data in such an enhanced way that it can be easily send over cloud platform.

Objective # 3: To visualize the condition of track graphically using Amazon Web Services (AWS).

Project Implementation Method

As we have set three main objectives of this project the implementation method for each objective is described below:-

  1. We will use three accelerometer sensors (ADXL335) in cantilever structure to detect cracks in rail, inclination sensor to detect inclination of track and Ultrasonic sensors to detect missing sleepers in between two rails all these sensors will be connected to Raspberry Pi, here raspberry pi will act as base station as shown in fig below :-
  2. We will set a threshold level to check healthy and unhealthy vibrations, Kalman filter and fast Fourier transform will be used to process the data. Raspberry pi will be connected to internet so that processed data can be send.
  3. We will use kinesis module of Amazon Web Services a cloud platform to visualize the condition of track.

We will place the prototype consisting of raspberry pi and sensors discussed above on a inspection vehicle and will be tested on railway track to ensure the working of project.  

Benefits of the Project

The primary benefits of this project are the time and labor saved when compared to doing manual inspections of track,the manual inspection which is done by human can lead to human error this project can help eradicating with this issue with a lot of time saved  as well. This autonomous inspection vehicle can measure the track in depth which a human is not capable of doing. We can commercialize this project as well because presently in our country there is no such method for a proper inspection of railway track.

Technical Details of Final Deliverable

The final deliverable of this project would be a prototype consisting of different sensors attached in a cantilever system, the prototype will be placed on a inspection like vehicle along with an artificial railway like structure with some defects to show the working of project. Apart from this a PC connected wirelessly with the vehicle to show the status of the track. A video containing the testing of project on railway track.

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Transportation

Other Industries

IT

Core Technology

Internet of Things (IoT)

Other Technologies

Artificial Intelligence(AI)

Sustainable Development Goals

Decent Work and Economic Growth, Industry, Innovation and Infrastructure, Sustainable Cities and Communities

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Raspberry Pi 4 Equipment11500015000
Arduino Uno Equipment1850850
64 GB Micro SD card Equipment112501250
LCD Monitor Equipment150005000
Keyboard Equipment1650650
Mouse Equipment1350350
Pi camera Equipment1900900
VGA to HDMI Converter Equipment1550550
Accelerometer (ADXL335) Equipment55002500
IR Sensor Equipment3145435
Ultrasonic Sensor Equipment3150450
Tilt sensor Equipment2200400
Jumper wire Equipment3010300
Power Bank for Raspberry Pi Equipment115001500
Transport Cost for visiting railway station Miscellaneous 125002500
Wooden work for designing Cantilever system Miscellaneous 120002000
Stationery Miscellaneous 1500500
Steel work for designing artificial rail Miscellaneous 115001500
Cost for designing Inspection Vehicle Miscellaneous 130003000
Total in (Rs) 39635
If you need this project, please contact me on contact@adikhanofficial.com
Geyser Thermostat Monitoring

The paper showed how an intelligent water geyser device was built. The objective of implem...

1675638330.png
Adil Khan
9 months ago
Blockchain based E certification

In this advance digitalize world, there are still some practices which are a bit tedious,...

1675638330.png
Adil Khan
9 months ago
Tracer

Social media platforms are changing the way organizations are communicating to the public...

1675638330.png
Adil Khan
9 months ago
Distracted Driver Detection

For the last few years there is a continuous increase in the number of road accidents worl...

1675638330.png
Adil Khan
9 months ago
Gallery De NFT

In our Fyp we're going to set up the marketplace of NFT that is the latest trend where&nbs...

1675638330.png
Adil Khan
9 months ago