Progress Monitoring & Tracking System with Academy-Industry Linkage Support

A platform for the alumni and faculty of Sir Syed University of Engineering & Technology to showcase their information and present their progress made throughout their career as well as their technical and academic skills, achievements and accolades. To bridge the gap between the industry and st

2025-06-28 16:28:52 - Adil Khan

Project Title

Progress Monitoring & Tracking System with Academy-Industry Linkage Support

Project Area of Specialization Cloud InfrastructureProject Summary

A platform for the alumni and faculty of Sir Syed University of Engineering & Technology to showcase their information and present their progress made throughout their career as well as their technical and academic skills, achievements and accolades. To bridge the gap between the industry and students pursuing their degrees using Community Cloud. The scope of the project is to develop a one-stop shop for everything related to the University and its personnel and provide a stage to view the details and data regarding them as well as to filter them out on a need to know basis

Project Objectives Project Implementation Method

We will implement our project through agile model. Phases of implemented method as follows:

1. Requirement gathering and Analysis: All possible requirements of the system to be developed are captured in this phase and documented in a requirement specification
document.

2. System Design: The requirement specifications from first phase are studied in this phase and the system design is prepared. This system design helps in specifying hardware and system requirements and helps in defining the overall system architecture.

3. Coding / Implementation: With inputs from the system design, the system is first developed in small programs called units, which are integrated in the next phase. Each unit is developed and tested for its functionality, which is referred to as Unit Testing.
 
4. Integration and Testing: All the units developed in the implementation phase are integrated into a system after testing of each unit. Post integration the entire system is tested for any faults and failures.

5. Deployment of system: Once the functional and non-functional testing is done; the product is deployed in the live environment.

Benefits of the Project Technical Details of Final Deliverable

Cloud based website 

Project Documentaton

Source Code

Marketing & Promotion

Business Canvas Plan, Brochures & Advertising

Final Deliverable of the Project Software SystemCore Industry ITOther Industries Education Core Technology Cloud InfrastructureOther Technologies Artificial Intelligence(AI)Sustainable Development Goals Quality Education, Industry, Innovation and Infrastructure, Partnerships to achieve the GoalRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 75400
Domain Registation Equipment194009400
A4 Size Scanner Equipment11800018000
Receipt Printer Equipment11000010000
HD Camera Equipment12000020000
Research & Publication Cost Miscellaneous 150005000
Broucher, FYP printing and binding, Poster, Standee Miscellaneous 150005000
Web Hosting Equipment180008000

More Posts