Energy distribution companies have different partners in Pakistan, like HESCO, LESCO, MESCO, etc, for commercial and domestic usage. The consumers are facing the issue of voltage fluctuation controlling and earth leakage detection in energized lines from the supplier companies randomly. These issues
Power Guard
Energy distribution companies have different partners in Pakistan, like HESCO, LESCO, MESCO, etc, for commercial and domestic usage. The consumers are facing the issue of voltage fluctuation controlling and earth leakage detection in energized lines from the supplier companies randomly. These issues are not rare for the consumers, so the suggest/designed smart electric system based on Arduino-UNO microcontroller integrated with a real-time system, and the developed system is able to automatically control the voltage fluctuations, and current, and indicate the earth leakage.
The circuit can be fundamentally divided into these stages, the first stage to make a circuit to mitigate/control voltage fluctuation issues and make it efficient by doing different experiments to make our appliances protect. The second stage of this project is to make a system that senses and controls if the problem occurs and restart the system. The third stage of this project is to make a protective system for humans because sometimes it gets shocked and the system continues working so it gets a severe injury and sometimes it causes death so this is the first and important objective of this project.
Technical details of final deliverables outline a project's entire scope of work, while deliverables created during earlier phases of a project are probably not selected. Our project's initial deliverables are based on the circuit design of the project and then go for the second deliverables, implementation of the circuit, and the third stage to making a “Thesis” and “Project report”. The ending phase of project deliverables can include a project business because there is a huge market that is waiting for this ‘Power Guard” device.
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Resistors | Equipment | 20 | 5 | 100 |
| Diodes | Equipment | 10 | 20 | 200 |
| Copper Plate | Equipment | 1 | 500 | 500 |
| Choke | Equipment | 2 | 150 | 300 |
| Capacitor | Equipment | 10 | 10 | 100 |
| Capacitive Load | Equipment | 2 | 100 | 200 |
| Blub & holder | Equipment | 2 | 200 | 400 |
| LCD | Equipment | 1 | 300 | 300 |
| Arduino UNO | Equipment | 1 | 2000 | 2000 |
| Connecting Wires | Equipment | 30 | 10 | 300 |
| Transformers | Equipment | 4 | 150 | 600 |
| Changeover Switch | Equipment | 1 | 300 | 300 |
| Connectors | Equipment | 10 | 5 | 50 |
| Switch buttons | Equipment | 4 | 100 | 400 |
| Thesis and Project Report | Miscellaneous | 2 | 4000 | 8000 |
| Total in (Rs) | 13750 |
High gain antenna desing in HFSS and then we optimise this in hardwear the propose of this...
After taking the Request for Proposals (RFP), initial rough weight sizing will be done. Th...
The corrosion is the material deterioration by virtue of certain chemical reactions that m...
Interior Design is a Android Application which will help new people (eg, home movers) thos...
We propose a blockchain-based Food traceability system which eradicates the problems of fo...