Power Generation Using steam turbine

In this project we will produce electricity using steam turbine.  We will first burn gas, which will heat the water and produce steam. Then this steam will be pressurize and move toward turbine through pipes, which will rotate the turbine. Turbine contains multiple blades w

2025-06-28 16:28:50 - Adil Khan

Project Title

Power Generation Using steam turbine

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

In this project we will produce electricity using steam turbine. 

We will first burn gas, which will heat the water and produce steam.

Then this steam will be pressurize and move toward turbine through pipes, which will rotate the turbine.

Turbine contains multiple blades which increases its speed.

Turbine is connected to taco motor which converts mechanical energy into electrical energy.

The steam from turbine is cool down and sent to water source. This process repeats.

Project Objectives

To produce electrical energy using steam.

To save natural sources. 

Used steam instead of gas in industry. 

Project Implementation Method

First we will design the structure of turbine, boiler,sequence controller then we will buy and assemble the hardware.

In first evaluation we will design and assemble boiler are arrange sequence through sequence controller.

In 2nd evaluation we will generate power from steam through turbine.

Benefits of the Project

It can be use at: 

• Generation stations

• Sugar Mills 

• Textile Industries

• Tile industries 

• Printing industries

Technical Details of Final Deliverable

Power would be generated from steam using boiler and turbine, sequence controller would be used to make sure all thing and steps run smoothly.

In case of any problem or hazerd whole system would be turned off.

Final Deliverable of the Project Hardware SystemCore Industry Energy Other Industries Others Core Technology OthersOther TechnologiesSustainable Development Goals Affordable and Clean EnergyRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 80000
Sequence Controller Equipment11500015000
Temperature controller Miscellaneous 11000010000
Mechanical frame Equipment12000020000
Temperature metter Equipment12500025000
Others Equipment11000010000

More Posts