In this project, the Pico hydro power system will be developed with the help of electrical and mechanical components. Such systems can be installed in a run of river areas especially in northern areas of Pakistan that would have no impact on climate change or where the electrical transmission networ

Project Title

Power Generation Through Pico Hydro System

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

In this project, the Pico hydro power system will be developed with the help of electrical and mechanical components. Such systems can be installed in a run of river areas especially in northern areas of Pakistan that would have no impact on climate change or where the electrical transmission network is not feasible. Initially, the Pelton turbine will be design in a CAD software and the material used to manufacture such turbine is acrylic whereas, the final product produced by means of a computer numerically controlled (CNC) lathe machine. The mechanical setup will be developed that comprise of PVC pipes, water tub, water control valves, Pelton turbine, and nozzles while, the electrical components involved are single phase AC generator, AC inverter, pressure transducers, flowrate sensors, battery, weighing scale, pump, and AC load respectively. A continuous water flow rate will be attained by means of a PVC pipes and centrifugal pump that pumps the water from available water in the tub. The inverter will be designed in a Proteus simulation software to operate the load of about 300W. In last, the generator and turbine efficiency will be checked at different water flow rates to achieve maximum power of 300W to operate the load.      

Project Objectives

  • Developing a prototype of Pico hydro power  system
  • Designing a Pelton turbine
  • Designing a single-phase AC inverter to operate AC load
  • Analyzing the effect of water flow rate on turbine and generator efficiency

Project Implementation Method

The project will be implemented in the following way.

  1. Developing a Pico hydro power system infrastructure by accompanying mechanical (PVC pipes for continuous water flow rate, water tub, Pelton turbine, control valves, and water injecting nozzles) and electrical components (single phase AC inverter, single phase AC generator, battery, centrifugal pump, pressure transducers, flow rate sensors, weight hanging scale, and AC loads) respectively.
  2. Designing an acrylic Pelton turbine in a CAD software with a final finished product obtained by CNC cutting lathe machine.  
  3. Designing an AC inverter in a proteus simulation software before installation in a Pico hydro power system.
  4. Generator and turbine efficiency will be analyzed at different water flow rates to achieve maximum power to operate the AC load.  

Benefits of the Project

The merits of the project are that such Pico hydro power systems can be installed in a run of river northern areas of Pakistan especially at resorts, where electricity transmission infrastructure through WAPDA is not feasible. Besides that, the project implementation has indirect effect on climate being environmentally benign by generating clean and affordable energy.

Technical Details of Final Deliverable

The Pico hydro power system prototype that would be able to generate 300W power along with its all required mechanical and electrical components, designed technically will be delivered at the end.

Final Deliverable of the Project

Hardware System

Core Industry

Energy

Other Industries

Core Technology

Clean Tech

Other Technologies

Sustainable Development Goals

Affordable and Clean Energy

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Mechanical Structure (PVC pipes and valves) Equipment2500010000
Generator and pump Equipment21500030000
Pelton Turbine Equipment170007000
AC inverter Equipment11000010000
Battery Equipment150005000
Sensors Equipment240008000
Stationary cost Miscellaneous 130003000
nuts and bolts Miscellaneous 170007000
Total in (Rs) 80000
If you need this project, please contact me on contact@adikhanofficial.com
0
105
Shuttling metro train between station and railway gate crossing

Technical development has enabled a train system that can monitor, drive and control the e...

1675638330.png
Adil Khan
11 months ago
Supply Chain Management Practices and Retail Performance: Consumer-rel...

We are investigating the association between supply chain management practices, supply cha...

1675638330.png
Adil Khan
11 months ago
Pakistan Sign Language Recognition

The project will involve collecting a dataset, performing research and finally develo...

1675638330.png
Adil Khan
11 months ago
IoT based Four Way Smart Traffic Signal Controlling System With Priori...

The conventional ways of controlling traffic jams in Pakistan is the presence of traffic g...

1675638330.png
Adil Khan
11 months ago
Smart Helmet using RASPBERRY PI

The Global status report on road safety 2018, launched by WHO in December 2018, highl...

1675638330.png
Adil Khan
11 months ago