Gilgit Baltistan region of Pakistan is spread over an area of 72,400sq km. The rivers and streams flows through almost every part of region. Fresh water is considered most important in the survival of humanity and other living organism. Gilgit Baltistan has been rich potential of fresh water, three

Project Title

Micro Hydro Turbo Generator for Remote Areas

Project Area of Specialization

Robotics

Project Summary

Gilgit Baltistan region of Pakistan is spread over an area of 72,400sq km. The rivers and streams flows through almost every part of region. Fresh water is considered most important in the survival of humanity and other living organism. Gilgit Baltistan has been rich potential of fresh water, three of the world largest glaciers are found in Gilgit Baltistan i.e. Biafo Glacier, Baltoro Glacier and Batura Glacier. Beside these glaciers 5,215 smaller glaciers and 2,420 glacial lakes are also located in Gilgit Baltistan.Electrical power place a vital role in over daily life and it is almost impossible to live without it. There are many methods to generating electrical power, one of which by deploying turbines on streams i.e. Hydro power plant (HPP). HPP convert potential energy of water into electricity. The water after generating electrical power is available for irrigation and other purposes. Hydroelectric powers plants (HPP) generate from few kW to thousand of MW so hydropower provided one on the best ways for rapidly expanding the country’s output.Once the electricity is produced, it must be delivered to where it is need. All the electricity made at power plants comes first through transformers which raise the voltage so it can travel long distances through power line.In proposed design of Hydro Turbo Generator (HTG), generator is not submerged into the water as of presently installed plants to resolve maintenance issues.The aim of the proposed project is design HTG for above mentioned areas where there are no resources available for site maintenance.The proposed HPP is generate electricity using water as fuel and will regulate the power. The performance of hydropower plants depends on many related parameters like hydraulic head, rate of flow, efficiency and selection of equipments.

Project Objectives

        Study,design and develop

  1. Turbine(Mechanics).
  2. Electrical(Generation and Distribution).

Project Implementation Method

Climate is the primary features that contribute to the hydrology of a region and is largely dependent on the geographical position on the earth’s surface. Climatic factors of importance are rainfall, its duration, intensity and aerial distribution. Other parameters are temperature, humidity, sunlight hours and wind run. All of these affect hydrological cycle. The climate of the project area can classified into two major seasons, wet (April-Oct) and dry Season (Nov-March).

Benefits of the Project

Hydro Power  have many benefits as compare to other renewable for elecric generation. Some are as under.

  • Hydropower is a fueled by water, so it's a  clean fuel source
  • .Hydropower doesn't pollute the air like power plants that burn fossil fuels,such ascoal or natural gas.
  • Hydropower relies on the water cycle, which is driven by the sun, thus it's a  renewable power source.

Technical Details of Final Deliverable

Input                                       

  • Information
  • Documents
  • Plan
  • Equipment
  • Money
  • Hardware

Output

  • Consultation
  • Project Plan
  • Tools
  • Programing
  • Hardware
  • Test Results
  • Contracts

Final Deliverable of the Project

Hardware System

Type of Industry

Energy

Technologies

Robotics

Sustainable Development Goals

Affordable and Clean Energy

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Mechanical Structure Equipment13000030000
Turbo Generator Equipment150005000
Control Unit Equipment180008000
Turbine shaft fan Equipment170007000
Panel Box with AVR Equipment11000010000
Gear Box Equipment170007000
Wire and screws Equipment130003000
Miscellaneous Miscellaneous 11000010000
Total in (Rs) 80000
If you need this project, please contact me on contact@adikhanofficial.com
0
129
Teacher Hiring Evaluation System

Abstract/Introduction Institutions hire faculty by just interviewing candidate which may l...

1675638330.png
Adil Khan
1 year ago
Flip classroom assesment

To automate the classrooms using deeplearning by marking the students on the basis of thei...

1675638330.png
Adil Khan
1 year ago
Arduino Trainer device

The motivation about functional generator is about trained student to learn about Arduino...

1675638330.png
Adil Khan
1 year ago
Ultimate Car Racing Game

In this project we are focusing on developing a Car Racing Game, using Unity Game Engine....

1675638330.png
Adil Khan
1 year ago
video

PHP Tutorial (& MySQL) #11 - Conditional Statements

AdiKhanOfficial
Adil Khan
3 years ago