Our final year project will be a 6 degree-of-freedom robotic arm aimed at being able to automate repetitive industrial tasks such as picking and placing, palletizing, and inspection while being able to adapt to different situations such as welding, soldering, CNC, etc, through the usage of an interc
Industrial Robotic Arm
Our final year project will be a 6 degree-of-freedom robotic arm aimed at being able to automate repetitive industrial tasks such as picking and placing, palletizing, and inspection while being able to adapt to different situations such as welding, soldering, CNC, etc, through the usage of an interchangeable tool head.
The initial design and prototyping will keep in mind the goal to commercialize this project as a locally produced industrial product within the next five years. Our group seeks to initiate a startup focused on improving the industrial sector of Pakistan through the use of automation and Industry 4.0/5.0 techniques. To showcase this resolve, our project will keep factors like IoT and remote automation in our scope and go through the necessary initial phase of finalizing our initial product design. We will focus on using rapid prototyping techniques such as 3D printing and acrylic manufacturing, as well as simulation software like MATLAB, LabView, and Onshape.
At the end of our project, we hope to have a fully functional robotic arm, complete with its own specification datasheet, a 3 kg payload, approximately a meter in fully extended length, and its own user-friendly software to interact, program and automate the robot through.
This project aims to accomplish the following:

The above figure explains our project implementation process. To reiterate in a step-wise manner, our implementation will consist of the following steps:

| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| High Quality Motors | Equipment | 5 | 11000 | 55000 |
| Electronics | Equipment | 1 | 7000 | 7000 |
| 3D Printing Filament | Miscellaneous | 1 | 3000 | 3000 |
| Drill bits | Equipment | 5 | 200 | 1000 |
| Soldering Tool | Equipment | 1 | 2000 | 2000 |
| Wires | Equipment | 10 | 100 | 1000 |
| Power Supply | Equipment | 1 | 4000 | 4000 |
| Manufacturing Services | Miscellaneous | 1 | 7000 | 7000 |
| Total in (Rs) | 80000 |
Why we need this project? Energy is one of the major issues that the world is facin...
The medieval approach for depositing bills has a number of disadvantages to it, for instan...
The Summary of our project is to reduce placing area in a ware house and place more t...
Human resource are the most important and valuable assest of any company. Many organizatio...
This project introduces the concept of recognition of different activities to assist elder...