This is Sami, bachelor student of University of Karachi Department of Computer Science, I?m aspire to work in a problem that GPUs has, GPUs lose their efficiency after 8 blocks and their speed not much faster as before and even it becomes 64 times slower than CPU if only one block is used so I eithe
apply machine learning on block chain
This is Sami, bachelor student of University of Karachi Department of Computer Science, I’m aspire to work in a problem that GPUs has, GPUs lose their efficiency after 8 blocks and their speed not much faster as before and even it becomes 64 times slower than CPU if only one block is used so I either want to make GPU block independent so that only one block will give performance greater than CPU or increase blocks' efficiency, I'll apply block chain on two different datasets, and want to trend block chain by machine learning Supervised algorithm that how can this two datasets not dependent on each other and if they are dependent so how can I manage that any dependent data not become part of another dataset, I want to increase the CPU’s bus width to achieve maximum speed because the GPU installed laptop is not much faster as cloud server online GPUs & I want to apply unsupervised learning algorithm of machine learning for Fibonacci Series because GPU fail to perform Fibonacci series as faster as matrix multiplication they did, I’m working under the supervision of SIR S.M.Khalid Jamal, I’ll be grateful if you provide me resources for my final year project.
Make GPU efficient after 8 blocks and even only one block is used and make GPU efficient even CPU's bus width not match with GPU's bus width or CPU's bus width is very less.
I'll implement the project by doing some CUDA programming, Fuzzy logic could be used because of working in between the values of 0 and 1 and Reinforcement learning may be used.
The core benefit of this project is efficiency, GPU is faster than CPU but it's speed depend on the number of blocks and CPU bus width so by working in this two fields efficiency could be increased.
The final deliverable will be the software system which is made by using CUDA programming Insha Allah
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Risc Miner | Equipment | 1 | 70000 | 70000 |
| Total in (Rs) | 70000 |
The main purpose or objective of our project is the comparison between multiple products a...
Our Project deals with the extraction of Bio fuel from the waste plastics known as PLASTIC...
Increasing environmental pollution due to rapid industrial development is one of the major...
Relays are major component of Electrical Power System Protection Infrastructure. The safet...
Textile industry in Pakistan is the country?s largest manufacturing industry where it cont...