Project is basically based on PLC based Industrial Automation.It involves four main parameters of Industry i.e Temperature, Presure,Level and Position(Proximity).These parameters are covered by Automation of Boiler and Bottle Filling System.. The Former covers Temperature and presure of Industry and

2025-06-28 16:33:07 - Adil Khan

Project Title

Industrial Automation using PLC (Programable Logic Controller )

Project Area of Specialization RoboticsProject Summary

Project is basically based on PLC based Industrial Automation.It involves four main parameters of Industry i.e Temperature, Presure,Level and Position(Proximity).These parameters are covered by Automation of Boiler and Bottle Filling System.. The Former covers Temperature and presure of Industry and later covers Level and position.

Project Objectives Project Implementation Method
  1. STAGE 1:

        2. STAGE 2:

This stage basically involves the bottle filling system.

After the completion of the interfacing, a trial run is done so as to be ensured that all the components including both software and hardware, are working satisfactorily.

This stage basically involves the Boiler.

This stage basically involves the interfacing of all the hardware components with each other as well as with the PLC.

Benefits of the Project

It can also be used in to the Following industries

Technical Details of Final Deliverable
  1. Bottle Filling System

Level sensors detect the level of water in the overhead Tank and automate the water Pump.

Proximity Sensors detects the bottle on the conveyor belt , when it is in front of solenoid walve it will be filled.

They also control Conveyor Motor

      2. Boiler Automation

Both Temperature and Presure Sensors detect temperature and presure in the Boiler and Automate Ignition Process.

Final Deliverable of the Project HW/SW integrated systemType of Industry Petroleum , Energy , Manufacturing Technologies OthersSustainable Development Goals Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 29020
Level Sensors Equipment238007600
Solenoid Walve Equipment110001000
DC Pump Equipment1300300
Over Head tank Equipment1500500
Proximity Sensor Equipment26501300
Relays Small Equipment450200
Relays Equipment2300600
Temperature Sensor Equipment110001000
Presure Sensor Equipment112001200
Presure Cooker Equipment1750750
Electric Heater Equipment1500500
Conveyor Frame Equipment110001000
UC Bracket Equipment43001200
Shaft Equipment2100200
Pulley Equipment2400800
Belt Equipment1300300
Conveyor Motor Equipment1500500
Motor Frame Equipment1220220
Boiler Frame Equipment1600600
Trainer Equipment1700700
PCB Sheets Equipment2400800
Temperature Sensor Miscellaneous 1250250
DC Pump Miscellaneous 1300300
Relays Miscellaneous 450200
Wires Equipment110001000
Connector Equipment1020200
Amplifier Ic Miscellaneous 450200
Travelling Cost Miscellaneous 150005000
Assembling Miscellaneous 1600600