Hpdc

The objective of our project is to  analyze the power quality in hvdc link. we did litereture survey of hvdc link ,we studied many of research papers and thesis written by different writers on hvdc link. After the completion of literature review we visited hvdc link in Matyari Lahore.

2025-06-28 16:32:57 - Adil Khan

Project Title

Hpdc

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

The objective of our project is to  analyze the power quality in hvdc link. we did litereture survey of hvdc link ,we studied many of research papers and thesis written by different writers on hvdc link. After the completion of literature review we visited hvdc link in Matyari Lahore. It is an 878km-long with 660kV high voltage direct current transmission  line constructed under the frame of CPEC. The visit was arranged by the NEPRA.The visit was made to make us able to know more about HVDC technologyThe visit  increased knowledge about the HVDC technology. Now after the completiong of visit and collection of data we are working on Simulation modeling of the whole conversion process. The main objective is to create a prototype of HVDC link

Project Objectives

The objectives of this project are :

Project Implementation Method

The process of implementation is described in points below:

Benefits of the Project

This project contain alot of  significances as the world is working on HVDC transmission .As it is highly appreciated over HVAC transmission because it reduce loses and power efficiency of HVDC transmission is much more better than HVAC transmission. So if we go towards the benefits it would be a big change in the world of power if we convert the whole transmission from HVAC to HVDC.
The major benifits of HVDC transmission are:

Technical Details of Final Deliverable

The prototype model of HVDC link will be the dilverable of our project.The model will be describing all the technical values of project and describing the project with briefly detail to make it understandable for anyone

Final Deliverable of the Project Hardware SystemCore Industry OthersOther Industries Manufacturing Core Technology OthersOther Technologies Big DataSustainable Development Goals Decent Work and Economic GrowthRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 49200
Invertor Equipment170007000
isolation transformer Equipment2650013000
Boost Convertor Equipment180008000
Buck converter Equipment156005600
Rectifier Equipment156005600
miscellaneous Miscellaneous 11000010000