Geotechnical study and survey of urbanizing peshawar region and their representation using GIS

The aim is to provide geological profile of urbanizing peshwar regions that include the lithostratigraphy, ground water level, and bearing capacity of soil at a certain position. these all properties will be provided virtually over a personalized software that will provide a one click acces to these

Project Title

Geotechnical study and survey of urbanizing peshawar region and their representation using GIS

Project Area of Specialization

Cloud Infrastructure,

Project Summary

The aim is to provide geological profile of urbanizing peshwar regions that include the lithostratigraphy, ground water level, and bearing capacity of soil at a certain position. these all properties will be provided virtually over a personalized software that will provide a one click acces to these information.

Project Objectives

The objectives are to collect data from different departments that have the geological reports of certain structures, such as mega structures (Bus Rapid Transit), geotechnical reports of different plazas, water tube wells strata charts. This data than will be studied organized, and a desired outcome is produced. 

Project Implementation Method

  1. Data collection from different departments.
  2. Studying existing data and marking the missing data of positions.
  3. The data studied will then be organized and implemented over GIS.
  4. Spatial mappings and graphs will then be inserted in a personalized software.    

Benefits of the Project

  1. Geological profile of urbanizing peshawar
  2. Water levels depths and its fluctuation with time.
  3. Bearing capacity of certain positions ( a calculator will be provided in the software that will have soil properties in it and the user wil provide properties of the foundation to calculate the bearing capacity).
  4. lithological profiles will be provided.

Technical Details of Final Deliverable

Software that will contain all these organized information will be programmed in a personalized interface, that will be easy human interaction and will be easily operable by engineering community.

Final Deliverable of the Project

Software System

Type of Industry

Agriculture , Energy , Manufacturing

Technologies

Cloud Infrastructure, Big Data

Sustainable Development Goals

Quality Education, Clean Water and Sanitation, Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
SPT/CPT Testing Equipment41500060000
Total in (Rs) 60000
If you need this project, please contact me on contact@adikhanofficial.com
0
195
development of degree of freedom machining bed

This project is deals with a new concept of a 6 Degree of Freedom robotic machining bed. T...

1675638330.png
Adil Khan
1 year ago
Development of low cost and effective wearable tremor control device

In this project we aim to make a wearable glove which will suppress the hand tremors of an...

1675638330.png
Adil Khan
1 year ago
Underground Cable Fault Location Detection using Machine Learning

Since modern systems do not locate exact location of the fault in cable which results in e...

1675638330.png
Adil Khan
1 year ago
Design a Quadcopter to inspect the power transmission lines

In power line inspection, it is made sure that the Inspection is safe. These inspections a...

1675638330.png
Adil Khan
1 year ago
Basic OOP Programs

1675638330.png
Adil Khan
7 years ago