Frequency Based Approach For The Detection of Railway Tracks Faults in Pakistan

Pakistan has quite a shoddy record when it comes to railway accidents. Within the past decade, the country has witnessed several catastrophic train accidents, and the number has increased over the past few years. Following are some significant accidents witnessed in the history of Pakistan:

2025-06-28 16:32:41 - Adil Khan

Project Title

Frequency Based Approach For The Detection of Railway Tracks Faults in Pakistan

Project Area of Specialization RoboticsProject Summary

Pakistan has quite a shoddy record when it comes to railway accidents. Within the past decade, the country has witnessed several catastrophic train accidents, and the number has increased over the past few years. Following are some significant accidents witnessed in the history of Pakistan:

According to BBC News, there are three leading causes of railway accidents in Pakistan, among which "Lack of Track Maintenance" tops the list. Statistics shows, half of the accidents occur near the railway junctions, and most of them are caused due to train derailments, which occurs due to damaged railway tracks. Therefore, to ensure passenger's safety and avoid disruption in services, the entire rail needs to be monitored periodically. Unfortunately, the current solution to detect track faults in Pakistan is "Manual Rail Inspection". The railway management team makes a visual survey of the track with a handheld trolley or a small bogie. This monitoring method is labor-intensive, time taking and prone to errors as it is hard to get creditable inspection results from the human eye.

Our project aims to solve this problem by implementing an automated system in a survey vehicle to detect gaps or damages in tracks. The device will install on the bogie's axle box. The model will initially store the expected bogie frequency. The inspection vehicle periodically travels over the rail network, and with the aid of accelerometer sensors, it continuously measures the frequency. The location where the expected frequency of recording vehicle gets disturbed is recorded using a GPS module. Although this model will only be a prototype for now, yet it would be sufficient to show how we can proceed to make the Railway Monitoring Systems in Pakistan completely automatic only with the assistance of Electronic devices. This automated system is expected to increase the robustness of safety systems in railway transport by providing effective results compared to Manual Monitoring.

Project Objectives

Our project aims to establish a proper Railway Track Monitoring system in Pakistan with the aid of electronic devices, so that faults in railway tracks can be easily and efficiently detected and maintenance can be done at the right time when needed, This as result will help us reduce the number of disastrous accidents.

Following are the short term goals or objectives of our project:

Project Implementation Method

Our project is based on detecting damages and faults in railway tracks with the aid of the IMU system. We will be using Axle Box Acceleration (ABA) measurement method, which is by far the most efficient approach for monitoring the railway tracks. We will start by designing a 3D model with a suitable dimension to be installed on a train bogie/Survey vehicle. The model will be designed using AutoCAD or SketchUp 3D. The designed model will then be sent for printing to Proto21 (a 3D printing services company). Once it is printed, it will serve as a base for our main components, i.e. Raspberry pi, GPS module and inertial sensors. Inertial sensors measure an object's acceleration or angular velocity along three mutually perpendicular axes (X, Y, and Z). We will use the accelerometer inertial sensors in our project. The accelerometer sensors will continuously monitor the acceleration of the bogie during the track survey. That acceleration will then be changed from the time domain to frequency using the FFT algorithms installed in the raspberry pi. The raspberry pi is connected to the GPS module which records the real-time location, as aforementioned. The complete model can be installed on the bogie’s axle box, which inspects the rail network periodically. The expected frequency of bogie will be already stored on the system so that system may know when the bogie’s normal frequency is disturbed. The location where the expected normal frequency of bogie is disturbed or changed is recorded by the GPS and is redirected to a nearby railway station. Our model is a minor attempt to determine how much efficient results the fully Automated Railway Maintenance System will yield.

Frequency Based Approach For The Detection of Railway Tracks Faults in Pakistan _1639950175.png

Benefits of the Project

Benefits of using our automated Railway Monitoring System are:

Technical Details of Final Deliverable

The final product is in the form of an electronic/hardware model or device which can be installed on the axle box of an inspection vehicle or bogie to provide the basis for an automated railway track monitoring system for the detection of joint or switch gaps and track damages. The final version of our device will be composed of raspberry pi, multiple three-axis acceleration sensors and Global Positioning System (GPS) module, interconnected with the help of multiple jumper wires. The device will use algorithms of Fast Fourier Transform (FFT) to convert the acceleration inputs recorded in time-domain to the frequency-domain. The frequency-domain output will then be compared with the regular expected frequency of the inspection bogie/train (which is already stored in system). If it matches, then the bogie will continue its survey. In case, at some point, the recorded frequency does not match with the original frequency. Then that location will be redirected to the nearby railway junction so that the officials can take measures to redress the damaged or gapped track.

Final Deliverable of the Project Hardware SystemCore Industry ITOther Industries IT , Transportation Core Technology RoboticsOther Technologies OthersSustainable Development Goals Affordable and Clean Energy, Decent Work and Economic Growth, Industry, Innovation and Infrastructure, Sustainable Cities and Communities, Responsible Consumption and ProductionRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 70000
Raspberry pi 3 Equipment2800016000
64-GB SD (Memory card) for Raspberry pi Equipment216003200
Accelerometer 335 Equipment65503300
GPS module Equipment220004000
Proto 21 3D model Equipment12500025000
HDMI cable for Raspberry pi Equipment29001800
Soldering Iron Equipment1400400
Vero Board Equipment2300600
Bread board Equipment2350700
Glue Gun Equipment1500500
Glue Gun Sticks Equipment2030600
Computer LCD Equipment130003000
Keyboard and Mouse Equipment1500500
Jumper Wires Equipment3030900
Soldering Wire Equipment1050500
12V Dry Battery Equipment120002000
Poster printing Miscellaneous 110001000
Thesis Book printing Miscellaneous 130003000
Project survey cost Miscellaneous 310003000

More Posts