Three Phase voltage stabilizer with monitoring system
The purpose of the is summary is to define our FYP project mistakes which are being recovered now, first we show our project proposal with the name “Three- phase voltage stabilizer with human machine interface display” in this project the controller we were going to use was “PLC” so when we present this project on presentation day some faculty member advice us to use “Arduino” on the place of “PLC” which will be cost effective and more will be provide same output likewise “PLC”. And we replaced “Human Machine Interface” as “Monitoring System” which will provide exact and accurate results
It is easy to install and require one time investment.
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| 3-Phase Transformers(Three /single phase Transformers) | Equipment | 1 | 21000 | 21000 |
| Relays | Equipment | 15 | 300 | 4500 |
| Arduino Controller | Equipment | 1 | 2500 | 2500 |
| LCD Display | Equipment | 3 | 1333 | 4000 |
| Voltage Sensor Sheet | Equipment | 3 | 1000 | 3000 |
| Circuit Breaker | Equipment | 1 | 4000 | 4000 |
| Maintenance Cost | Equipment | 1 | 8000 | 8000 |
| WiringCost | Equipment | 1 | 2000 | 2000 |
| Other Equipments | Equipment | 8 | 624 | 4992 |
| Total in (Rs) | 53992 |
In this contemporary world HVDC enables secure and stable asynchronous interconnection of...
Summary Expanding student engagement has risen as a key test for lecturers and teaching o...
Annually about 4.2 million people lost their life?s as a result of exposure to outdoor pol...
Traditional recruitment consume the lots of human efforts and cost of organization. The e...
A bunch of new students enroll into the university and are immediately thrown into high ge...