Three phase transmission line are soul of power system. In this project different types of fault are classified in the three phase transmission line.. Fault occurrence in power systems could result in losing their stability and cause severe damages in faulted devices or adjacent healthy devices. Als

Project Title

Three phase transmission line fault detector and analyzer

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

Three phase transmission line are soul of power system. In this project different types of fault are classified in the three phase transmission line.. Fault occurrence in power systems could result in losing their stability and cause severe damages in faulted devices or adjacent healthy devices. Also, stability proposition is charged as an important component in energy management and planning of power systems. Moreover, during the motor starting period, it draws a large current from the system, results in voltage drop of system and poses disturbances to the normal operation of other loads. Various studies have shown that anywhere from 70%, to as high as 90%, of faults on most overhead lines are transient. A transient fault, such as an insulator flashover, is a fault which is cleared by the immediate tripping of one or more circuit breakers to isolate the fault, and which does not recur when the line is reenergized. Faults tend to be less transient (near the 80% range) at lower, distribution voltages and more transient (near the 90% range) at higher, sub transmission and transmission voltages. Lightning is the most common cause of transient faults, partially resulting from insulator flashover from the high transient voltages induced by the lightning. Other possible causes are swinging wires and temporary contact with foreign objects. Thus, transient faults can be cleared by momentarily de-energizing the line, in order to allow the fault to clear. Auto reclosing can then restore service to the line. The remaining 10 - 30% of faults are semi-permanent or permanent in nature. A small branch falling onto the line can cause a semi-permanent fault.

Project Objectives

(1) Our aim and objective is to detect the fault in three phase transmission line Ground to line fault and line to line fault (2) Provide the safety for society (3) Fault classification and detect the actual point of fault (4) Analysis and detect the symmetrical and un symmetrical fault (5) Protection to the equipment of grid stations

Project Implementation Method

Task 1: Project analysis Task 2: Market survey to find out the circuit elements for best possible configurations Task 3: Component testing Task 4: Design and development of project. Task 5: Developed programming for the project. Task 6: Hardware (prototype design) Task 7: Project testing Report writing

Benefits of the Project

(1) Increase the safety of power transmission line (2) this idea use to industries to detect the fault in transmission line (3) Cost efficient (4) Transmission line fault detection on exact location / distance (5) Protection to the equipment of grid station and save the money of organization

Technical Details of Final Deliverable

(1) Our aim and objective is to detect the fault in three phase transmission line Ground to line fault and line to line fault (2) Provide the safety for society (3) Fault classification and detect the actual point of fault (4) Analysis and detect the symmetrical and un symmetrical fault (5) Protection to the equipment of grid stations

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Energy

Other Industries

Core Technology

Others

Other Technologies

Sustainable Development Goals

Partnerships to achieve the Goal

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
ENERGY ANALYZER,EOCR.PSM,EFI,VOLT METER .AMPERE METER .ETC Equipment10700070000
Total in (Rs) 70000
If you need this project, please contact me on contact@adikhanofficial.com
0
138
HUBZUH

Digital buyers? penetration worldwide states from 1.3$ Trillion to 3.5 Trillion in (2...

1675638330.png
Adil Khan
1 year ago
Design and Hardware Implementation of Bidirectional Power Converter Fo...

Electric Vehicles are becoming an emerging trend and will eventually penetrate in the powe...

1675638330.png
Adil Khan
1 year ago
CHEXECURE

Identification card (ID cards) becomes the main reference in obtaining information from a...

1675638330.png
Adil Khan
1 year ago
Alumni mangement system

We made a system Alumni Management System which is helpful for university Alumni associati...

1675638330.png
Adil Khan
1 year ago
Antenna Trainer

The proposed antenna simulator can simulate the received signal to display the signal para...

1675638330.png
Adil Khan
1 year ago