The Efficent Warehouse pick and place system

The Summary of our project is to reduce placing area in a ware house and place more things in small area. The Introduction of our project is that usually, warehouses reserve the large space of area and now a days we know that how much space we required, to place our things. We tend to lay a

2025-06-28 16:36:19 - Adil Khan

Project Title

The Efficent Warehouse pick and place system

Project Area of Specialization RoboticsProject Summary

The Summary of our project is to reduce placing area in a ware house and place more things in small area.
The Introduction of our project is that usually, warehouses reserve the large space of area and now a days we know that how much space we required, to place our things. We tend to lay a foundation for a more efficient mechanism of storing and moving the components in a warehouse, such as boxes.
The Background of our work such as This Project is never done by anyone in previous batches our idea is totally new. This idea we take from smart car parking system (Germany). In small size of area how many maximum car can be parked. Our project is similar to this project and we can build this prototype project to save that all thing which we are describe below: by the implemented this project we can also save the place as well as the total process of picking and placing because this project is totally autonomous start with the instruction and end with the parcel office. what we instruct or what we order that we need so that particular parcel is at our doorstep.
The previous project is contain more space area for the particular item and that item is avail or not but it reserve is own shelf our project is to simple save the storage area. critical part of this supply chain is the logistics of the warehouse that these online companies use to store products until they are purchased, picked, and shipped. The most important function in warehouse is the picking process, which is currently largely manual, cumbersome and costly. It requires careful sorting, picking and finally placement on the distribution spot for final delivery. The main purpose of our project is to save the area as well as Storage system and the other warehouses project is based on largest area and that’s why we can replace robot with CNC Motor.by the using this and more equipment we can eisaly build a efficent prototype project 

Project Objectives

. Aims and Objectives of Project: (doable Targets, Goals, Steps you will take to achieve your project Aims,)

The main aim of our project is create an automated warehouse, in order to reduce human effort, increase efficiency and reduce costs. In order to achieve the said goal, following are main objective of our project:
To design a Autonomous  robot platform, that will navigate to the target place.
To implement a system for object identification and tracking.
To develop a manipulator system for pick and place of the objects.

Project Implementation Method

A critical part of this supply chain is the logistics of the warehouse that these online  companies use to store  products until they are purchased, picked, and shipped. The most important function in warehouse is the picking process, which is currently largely manual, cumbersome and costly. It requires careful sorting, picking and finally placement on the distribution spot for final delivery. The main purpose of our project is to save the area as well as Storage system and the other warehouses project is based on largest area and that’s why we can replace robot with CNC Motor.

Benefits of the Project

To design a Autonomous  robot platform, that will navigate to the target place.
To implement a system for object identification and tracking.
To develop a manipulator system for pick and place of the objects.

Space Efficient 

Technical Details of Final Deliverable

This idea we take from smart car parking system (Germany). In small size of area how many maximum car can be parked. Our project is similar to this project and we can build this prototype project to save that all thing which we are describe below: by the implemented this project we can also save the place as well as the total process of picking and placing  because this project is totally autonomous start with the instruction and end with the parcel office. what we instruct or what we order that we need so that particular parcel is at our doorstep.
The previous project is contain more space area for the particular item and that item is avail or not but it reserve is own shelf  our project is to simple save the storage area.

Final Deliverable of the Project HW/SW integrated systemType of Industry IT , Transportation Technologies Artificial Intelligence(AI), RoboticsSustainable Development Goals Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 45700
Robertic aram Equipment4700028000
Canveyor belt Miscellaneous 150005000
Stepper motor Equipment49003600
GSM module Equipment215003000
Servo 180 Equipment45502200
Aurdino nano Equipment54002000
I.R sensor Equipment6150900
Jumper wire Miscellaneous 100101000