Adil Khan 11 months ago
AdiKhanOfficial #FYP Ideas

Solid Waste Management

Garbage collection and management is a crucial problem faced by every nation due to a number of factors. On the other hand, it is so important because every human in the world is generating waste every moment. We can automate this process using cutting-edge technologies like the Internet of Things (

Project Title

Solid Waste Management

Project Area of Specialization

Internet of Things

Project Summary

Garbage collection and management is a crucial problem faced by every nation due to a number of factors. On the other hand, it is so important because every human in the world is generating waste every moment. We can automate this process using cutting-edge technologies like the Internet of Things (IoT) and Artificial Intelligence models.

One of the main concerns with our environment has been solid waste management which in addition to disturbing the balance of the environment also has adverse effects on the health of the society. The detection, monitoring, and management of waste are one of the primary problems of the present era. the process of making things automatic is being exploited in almost all the major fields of life. Solid waste which is one of the sources and causes of environmental pollution has been defined under the Resource Conservation and Recovery Act as any solid, semi-solid liquid, or contained gaseous materials discarded from industrial, commercial, mining, or agricultural operations and from community activities.

Project Objectives

  • The main objective of this project is to speed up the communication between containers and garbage collectors
  • Tracing the location of the filled container.
  • Produce reports on the fly so that no one can defend his bad progress
  • Identification of vehicle/Team after collecting the waste
  • Verification of the container after cleaning
  • Send notification to the head if the container is still full after an undefined time

Making Alert in case of 2-3 hours of the 1st notification if the container is still full

Project Implementation Method

  • The main objective of this project is to speed up the communication between containers and garbage collectors
  • Tracing the location of the filled container.
  • Produce reports on the fly so that no one can defend his bad progress
  • Identification of vehicle/Team after collecting the waste
  • Verification of the container after cleaning
  • Send notification to the head if the container is still full after an undefined time
  • Making Alert in case of 2-3 hours of the 1st notification. if the container is still full.

Benefits of the Project

In this Modern Era, the solid waste management system is manual due to which contains a lot of problems in proper management while collecting solid waste. On the other hand, the existing system has human involvement due to which the system is inefficient and not reliable. These problems are increasing parallel to each other so these must be addressed in parallel to completely overcome this kind of problem. If we are able to do this, we can:

  • Overcome the problems of proper management.
  • Find the best time to collect the garbage.
  • Utilize the human resources.
  • Notify the management about events.
  • Save fuel consumption of the garbage trucks.
  • Send people queries directly to the controlling heads.

Technical Details of Final Deliverable

As the project consists of two main operational units i.e. Training model to classify the filled and empty container and sending the reports and notifications to the end-users. So, based on this we have divided our whole project into two major milestones:

  • The first milestone is to complete the training model. This milestone is further divided into small objectives which will be addressed from time to time. The first one is to find the best dataset or maybe to prepare a dataset keeping the Pakistan situation of full or empty containers. After that, we have to find the best model that can mimic a brain that knows when a container is full/empty.

Our focus is to complete this module before the end of the 7th semester, so we have roughly 3 months for it.

  • The second milestone is to complete the notification and report module. This is the part that needs a good understanding of the situation because it contains the decision part where we will take the steps to make a decision that will notify the garbage collector. At the same time, we will work on reports to keep the record. The deployment part also falls into this category.

Our focus is to complete this module at the start of next semester (8th Semester).

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Others

Other Industries

Core Technology

Internet of Things (IoT)

Other Technologies

Sustainable Development Goals

Climate Action

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Arduino Uno Equipment1885015300
Ultrasonic-Sensor(HC-SR04) Equipment7216011520
GSM Module(SIM800L-G54) Equipment1880014400
GPS(GPSNEO-B117) Equipment1895017100
Breadboard Equipment181502700
Total in (Rs) 61020
If you need this project, please contact me on contact@adikhanofficial.com
Continuous gesture recognition for flexible human robot interaction

Recently, The concept of human-robot interaction raised many research interests. Instead o...

1675638330.png
Adil Khan
11 months ago
Smart Traffic Lights

Automation plays an important role in today?s human life and people?s life is changing gra...

1675638330.png
Adil Khan
11 months ago
Osmoregulatory Watch

The osmoregulatory watch is one of the most important application , that should be invente...

1675638330.png
Adil Khan
11 months ago
Source code detection from downloaded video tutorials

In this era of learning through the internet, majority of the computer science students pr...

1675638330.png
Adil Khan
11 months ago
EEG AND FER BASED EMOTION RECOGNITION

  Making the computer more empathic to the user is one of the aspects of affective c...

1675638330.png
Adil Khan
11 months ago