Solarization of Academic block in UET Bannu campus

Nowadays, due to the decreasing amount of renewable energy resources, the last ten years become more important for per watt cost of solar energy device. It is definitely set to become economical in the coming years and growing as better technology in terms of both cost and applications. Everyday ear

2025-06-28 16:29:37 - Adil Khan

Project Title

Solarization of Academic block in UET Bannu campus

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

Nowadays, due to the decreasing amount of renewable energy resources, the last ten years become more important for per watt cost of solar energy device. It is definitely set to become economical in the coming years and growing as better technology in terms of both cost and applications. Everyday earth receives sunlight above (1366W approx.) This is an unlimited source of energy which is available at no cost. The major benefit of solar energy over other conventional power generators is that the sunlight can be directly converted into solar energy with the use of smallest photovoltaic (PV) solar cells. There have been a large amount of research activities to combine the Sun’s energy process by developing solar cells/panels/module with high converting form. the most advantages of solar energy is that it is free reachable to common people and available in large quantities of supply compared to that of the price of various fossil fuels and oils in the past ten years. Moreover, solar energy requires considerably lower manpower expenses over conventional energy production technology.

Project Objectives

The Main Objective of our project is to Improve the quality of Pakistan’s power supply and strengthen the system’s security requires investment and operational changes.

The country is currently facing a significant power surplus due to new generation additions and weaker than projected demand, in part due to the COVID-19 pandemic. However, Pakistan needs to ensure it avoids a repeat of the boom-and-bust cycle of underinvestment in power generation followed by emergency capacity development that has characterized recent decades. VRE represents a “no regret” option that can be developed relatively quickly and can displace fuel from inefficient thermal plants and reduce various cost and supply risks such as import dependency or delays of major hydropower projects. If VRE targets are met, up to $5 billion could be saved in potential fuel and other costs.

Project Implementation Method

We implement our project when studying many research papers and find that microgrids solar energy can be installed in which way so for that we buy the materials and implement it in practical we buy 2 solar panels, inverter, and UPS with battery and connect it for operation 

Benefits of the Project

Pakistan aims at achieving 5-6% of its total on-grid electricity supply from renewables (excluding large hydropower) by 2030. Total installed power capacity stood at 26 GW at year-end 2016, of which 4.2 % was renewable energy.

Pakistan is blessed with a high potential of renewable energy resources, but so far, only large hydroelectric projects and few wind and solar projects have harnessed this potential. Renewable Energy accounts for 1136 MW presently installed capacity of solar PV, wind and biomass based power projects. Possibilities also exist in promoting greater use of wind, solar and biomass project. 

Previously Government of Pakistan (GoP) had announced various policies and enabling environments such as feed-in tariff/upfront tariff, tax incentives, net metering, long term refinancing facility and micro-financing schemes for promoting corporate sector investment in the renewable energy (RE) sector. Taking the market growth, technological developments, recent cost reductions and new financial mechanisms into account, the GoP decided to liberate the market and instigate more competition amongst the private sector players for delivering electricity from RE resources (i.e. wind/solar) at optimal tariff rates. Accordingly, the GoP introduced tenders to call for competitive/reverse bidding for the RE power projects and the first phase of bidding for wind power projects has been initiated.

Technical Details of Final Deliverable

A solar PV system should consist of the following equipment: 

i. Solar Power Generation system consisting of the required number of PV Modules. 

ii. Efficient On-Grid/Hybrid Inverters

iii. Mounting structures 

iv. Cables and hardware

v. Miscellaneous Item

Final Deliverable of the Project Hardware SystemCore Industry Energy Other Industries Others Core Technology OthersOther Technologies Clean TechSustainable Development Goals Affordable and Clean EnergyRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 80000
Solar pannel Equipment22000040000
inverter Equipment12000020000
UPS Equipment11000010000
Miscellaneous Miscellaneous 11000010000