Adil Khan 10 months ago
AdiKhanOfficial #FYP Ideas

Software Automation of Assembly and Inventory Line

Our project is basically totally industrial based that is for HIT, Taxila.   ?The Heavy Industries Taxila is one of the largest defense products manufacturer and has grown into a military industrial complex since its foundation 1971. ?As we know that Heavy Industries Taxila

Project Title

Software Automation of Assembly and Inventory Line

Project Area of Specialization

Software Engineering

Project Summary

Our project is basically totally industrial based that is for HIT, Taxila.

•The Heavy Industries Taxila is one of the largest defense products manufacturer and has grown into a military industrial complex since its foundation 1971.

•As we know that Heavy Industries Taxila is continuously involves in the development of heavy engineering works for military and civilian law enforcement agencies.

•They have assembly line is a production equipment that specializes, various assembly, inspection, marking, packaging in the later stages of product manufacturing.

•They might have assigning of their upcoming year’s project at the start of every year like how much tanks they have to made and what kind of model and designing they have to implement in that whole year. So these tanks has to be modeled in that assembly line.

Project Objectives

Our main working objective for our project is given below in a short summary;

•The main objective of this project is to decrease time with minimum wastage of resources and increase productivity rate of tanks in Heavy Industries Taxila (HIT).

•We need to design our project in a such a way that manages the tank’s data as well as make their performance and productivity optimize in terms of time and resources.

  • To create a Software for Automation of Inventory and Assembly Line
  • Monitoring of Inventory and Assembly Line
  • Insertion,updatation and deleting of Inventory and Assembly Line through queries.
  • Database of both Inventory

Project Implementation Method

Currently we have observed the working of Inventory and Assembly Line system so we are basically at the stage of deciding our main tools to be used for this project is going to be decided in a short period of time due to some technicalities going on in this project.

•For software automation we need to Online Monitoring Application for higher authorities of HIT to actually tracking the progress rate of the assigned task.

•Databases has to be maintained that are directly linked with the main store.

•Our online application should contain every single detail of the assigned task i.e. how many operations are actually implemented today? , in case of any delay what kind of delay occur and how to deal with it? , how much time will be required to resolve this delay?

Our Software that is our project is going to be implemented on the shops and as well as at the areas of Inventory and Assembly Line.

Benefits of the Project

There will be several benefits that are going to be offered by us in this project, some of few are given below;

•The current method of  HIT, Taxila is basically traditional file based approach . They need a management system to make files of every shop and need to manage it accordingly so our software will be able to do it in a quick way as compared to doing it in a manual way.

•Assembly line management problem is complex problem for the  HIT workers as well as the higher authorities. They need some kind of application by which they would be able to track the working of Shops i.e. specifically for shop one so our software will be quite efficient in saving time.

• Saving time is also our main focus during this project we will make sure to save as much as time for the workers that are working on the inventory or assembly.

•Monitoring of inventory and the whole process will be covered.

Technical Details of Final Deliverable

So we are going to deliever our project in the form of phases that are given below;

  • Preliminary investigation of our main problem has been highlighted so we have started working on our problem statement for that we have to manage the database of inventory and assembly line so final deliverable project will contain secure database.
  • Hardware System which may include a monitoring output device to show our software on it.
  • Desktop Application will be shown at the end of the semester project to our partner that is HIT.
  • Proper management system will be created and it will be totally HW/SW based.

Furthermore things are going to be added later because currently we are working and thinking on it.

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Manufacturing

Other Industries

Core Technology

Others

Other Technologies

Sustainable Development Goals

Decent Work and Economic Growth, Industry, Innovation and Infrastructure, Partnerships to achieve the Goal

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Smart Device Equipment13000030000
Screen Equipment13000030000
Printing Papers Miscellaneous 50052500
Documentation of Thesis Miscellaneous 1505750
Sensors Equipment82502000
Total in (Rs) 65250
If you need this project, please contact me on contact@adikhanofficial.com
IoT based smart energy meter

A smart meter is the next generation of an electricity meter. They're being installed by e...

1675638330.png
Adil Khan
10 months ago
E farming

E-farming aims to help common people to grow and harvest the seasonal crops and vegetable...

1675638330.png
Adil Khan
10 months ago
Waste Monitoring and Management system

The Holy Prophet (PBH)said that ?Cleanliness is the half of belief.? (Hadith)  &...

1675638330.png
Adil Khan
10 months ago
Speed control of single phase induction motor using PLC

In this project we are concluding that speed of induction motor is measured using tachomet...

1675638330.png
Adil Khan
10 months ago
Design and Analysis of Tensegrity Robot

Tensegrity robots can withstand high impact loads and by use of ingenious control systems...

1675638330.png
Adil Khan
10 months ago