We all are living in 21st century now and the population growth is increasing in a sharper rate. As the population is increasing day by day the chances of accident occurring is also increasing. Prevention of this meeting accidents are of great concern today. The main cause of all these accidents are
Smart Safety and Accident Prevention System for Mountain Roads
We all are living in 21st century now and the population growth is increasing in a sharper rate. As the population is increasing day by day the chances of accident occurring is also increasing. Prevention of this meeting accidents are of great concern today. The main cause of all these accidents are negligence , negotiation of safety measures etc. As technology is getting advanced in a greater speed safety measures also being modified but still accidents are still happening. Earlier various steps were taken to prevent those accidents but still accidents were occurring at a higher rate. GPS(Global Positioning System) and GSM(Globalization Management System) were introduced but both of these were useful after accidents had happened as GPS is used to give information regarding the location and GSM is useful for sending messages from the users mobile to indicate the authority that accident happened. GPS and GSM are used for indicating that accidents occurred but our proposed model is an exception to all this as it prevents the accident from occurring and thus saving lives. Our proposed model is an indication system that indicates accident may occur so that we can take necessary measures to avoid these accidents. Thus this is a one step towards life saving and its also on we humans how we take care of our own safety as safety comes along with us.
objectives :
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| sensor | Equipment | 8 | 1000 | 8000 |
| Arduino Uno R3 | Equipment | 4 | 1300 | 5200 |
| Arduino Microcontroller ? | Equipment | 2 | 1500 | 3000 |
| Transformers | Equipment | 2 | 2000 | 4000 |
| IC | Equipment | 4 | 2000 | 8000 |
| PCB and Breadboard | Equipment | 4 | 1000 | 4000 |
| LCD for Display | Equipment | 5 | 500 | 2500 |
| RF module | Equipment | 4 | 1000 | 4000 |
| Proximity Sensor | Equipment | 4 | 3500 | 14000 |
| Adapters | Equipment | 2 | 1500 | 3000 |
| Lora module | Equipment | 4 | 3000 | 12000 |
| Stationary | Miscellaneous | 1 | 10000 | 10000 |
| Total in (Rs) | 77700 |
Summary: The purpose of building this sort of application is, there is no such real time g...
We have to design a torsional fatigue testing machine at low cost. A Torsional fatigue mac...
Loan Management Solution is an innovative, turn-key, lending platform that connects lender...
Authentication Using Gait Analysis: As Human gait is unique for every individual.It is syn...
This project Departmental Management system (online system) proposed to replace the curren...