Single Phase Smart Energy Metering System

The energy resource management is a major concern worldwide. This paper is based on GSM based smart energy metering system for remote monitoring and controlling of the power consumption patterns and energy billing.The proposed system utilizes remote communication with use of GSM module. The

2025-06-28 16:35:02 - Adil Khan

Project Title

Single Phase Smart Energy Metering System

Project Area of Specialization Internet of ThingsProject Summary

The energy resource management is a major concern worldwide. This paper is based on GSM based smart energy metering system for remote monitoring and controlling of the power consumption patterns and energy billing.The proposed system utilizes remote communication with use of GSM module. The calculations related power consumption are made through a digital energy meter in terms of units and are passed on to the GSM module which acts as Data Forwarder. The GSM module will transmit the data to the supplier end. So the whole proposed method will function in two way communication as GSM module facilitates bidirectional communication. All details related the hardware and software are discussed in this paper. The benefits associated with this system are many, such as remote (wireless) communication, accuracy, global coverage range, minimal power loss in devices used. The information related power consumption is transmitted at the supplier end where it is stored and utilized for future references and customer billing system. The proposed communication infrastructure equipped with SMS technology provides fast and efficient assurance of these measures. 

Project Objectives Project Implementation Method

A complete hardware and software based embedded system. the final deliverable will be the basic unit to be able to measure all the energy consumed detail. 

Benefits of the Project Technical Details of Final Deliverable

final product will be a compelete smart energy meter which will track line voltages contineuolsy and meaures the power consumed. at the end of month it will send bill to user as well as supplier end (wapda). user can have access to control his/her montly bill by controlling load at peak hour. in addition electric supplier company can have contol to cut the electric supply if any user don't pay his/her liabilties.

a compelte working prototype to be install in front of users house.

Final Deliverable of the Project HW/SW integrated systemType of Industry IT , Energy , Security , Telecommunication Technologies OthersSustainable Development Goals Affordable and Clean Energy, Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 36999
Micro controller Equipment210002000
Voltage transformer Equipment25001000
Current transformer Equipment25001000
LCD Equipment3333999
GSM shield Equipment235007000
Multiple channel relays Equipment410004000
dis.component Equipment130003000
PCB Equipment150005000
meter covering Equipment120002000
Load + installation Equipment110001000
wapda meter for comparing Equipment150005000
misc Miscellaneous 150005000