Railway smart driving assistant system
? Most accidents are occurred due to human negligence , so that?s why GPS system is used to get signal automatically of another train and apply automatic brakes of both train. ? Most accidents are occurred due to damaged track, so some sensors are used to detect the damaged part of the track.
2025-06-28 16:34:40 - Adil Khan
Railway smart driving assistant system
Project Area of Specialization Information & Communication TechnologyProject Summary• Most accidents are occurred due to human negligence , so that’s why GPS system is used to get signal automatically of another train and apply automatic brakes of both train.
• Most accidents are occurred due to damaged track, so some sensors are used to detect the damaged part of the track.
• Most accidents are occurred in populated area , so automatic barrier system is used to reduce the risk of accidents.
• Most accidents are occurred in smoggy or foggy weather that the driver couldn’t get informed that there is an obstacle in some distance so he can apply brakes, so that’s why some sensors are used that will operate in foggy weathers too.
? After the completion or at the end of FYP , this system is to be installed in
Pakistan railways. It can make our railway system more safe and reliable than other means of transportation.
The objectives of this project are as follow:
1. Indicates presence of another train on same track
2. Detect of the damaged track
3. Automatic barrier system
4. Indicates obstacle on track during Foggy weather
5. System will operate through an application/software.
First, all the simulations are done on softwares such as proteous and matlab
then all the objectives are implemented on hardware
Benefits of the ProjectTwo trains reach their stations safely and timely:
station 1 => Detect any obstacle on track => Barriers will be closed automatically => Detection of damaged track => If accidentally two trains coming towrds each other on same track then brakes applied automatically => both trains will reach their stations timely and safely => station 2(destination)
Technical Details of Final Deliverableerrors will be reduced that occur due to human negligence because it is an automated system and human work is negligible.
Final Deliverable of the Project HW/SW integrated systemCore Industry TransportationOther Industries Others Core Technology OthersOther TechnologiesSustainable Development GoalsRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 40000 | |||
| Hardware | Equipment | 5000 | 8 | 40000 |