Procurement and assembly of electric vehicle for special person
Our project is based on the procurement and the assembly of electric vehicle for special person (such as handicaps,old age person etc) .Our main objective is procurement of parts from best available options. We developed an efficient and economical vehicle that will be used for wel
2025-06-28 16:28:51 - Adil Khan
Procurement and assembly of electric vehicle for special person
Project Area of Specialization Mechanical EngineeringProject SummaryOur project is based on the procurement and the assembly of electric vehicle for special person (such as handicaps,old age person etc) .Our main objective is procurement of parts from best available options. We developed an efficient and economical vehicle that will be used for welfare purposes. Through proper sourcing techniques and through proper supply chains(online & offline market) we reached our final product.
Project Objectives1. To assemble an electric vehicle that will provide a comfortable ride for special person within the campus
2. To procure the economical parts for the assembly of electric vehicle in Pakistan
Project Implementation MethodThe focus of methodology is primarily on building purposes. After discovering all the parts from the dealers available in Pakistan so that an electric vehicle can be made.
- The desired goals
All the parts should contain the requirements which are approved by the international suppliers .After getting the know how of all the parts required, assembling them is an option.
- The required final deliverable
The making of an electric vehicle benefits the special people which are unable to walk. This can be great asset for them.
Benefits of the ProjectThe benefits of project includes:
- Economic Growth
- Less fossil fuel dependence
- Clean Environment
- Provides ease to special persons.
- Less expenditures
Final deliverable
To design and make an electrical vehicle for the ease of special people in the society. For those who are unable to walk properly. This electric vehicle will be an asset for them.
Final Deliverable of the Project Hardware SystemCore Industry TransportationOther IndustriesCore Technology OthersOther TechnologiesSustainable Development GoalsRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 80000 | |||
| Seat | Equipment | 1 | 2000 | 2000 |
| Basket | Equipment | 1 | 1000 | 1000 |
| Battery | Equipment | 1 | 18000 | 18000 |
| Battery Box | Equipment | 1 | 7000 | 7000 |
| Wheels | Equipment | 4 | 1500 | 6000 |
| Shock Absorbers | Equipment | 4 | 1300 | 5200 |
| Speed Controller | Equipment | 1 | 600 | 600 |
| Steering Handle | Equipment | 1 | 2000 | 2000 |
| LED Light | Equipment | 1 | 1200 | 1200 |
| Electric Motor | Equipment | 1 | 9000 | 9000 |
| High Speed Internet | Equipment | 12 | 1500 | 18000 |
| Travelling | Miscellaneous | 1 | 5500 | 5500 |
| Prints and Stationary | Miscellaneous | 3 | 1500 | 4500 |