Adil Khan 1 year ago
AdiKhanOfficial #FYP Ideas

POWER SYSTEM SURVEILLANCE USING QUAD-COPTER IN REAL TIME

Proper distribution of electricity is problem, facing by the eservice provider. They face many issues during this one of the major issue or this is the faults occurs in insulators. To avoid this issue they use their employees for surveillance of this which is harmful for them and more time and resou

Project Title

POWER SYSTEM SURVEILLANCE USING QUAD-COPTER IN REAL TIME

Project Area of Specialization

Robotics

Project Summary

Proper distribution of electricity is problem, facing by the eservice provider. They face many issues during this one of the major issue or this is the faults occurs in insulators. To avoid this issue they use their employees for surveillance of this which is harmful for them and more time and resources consuming. We introduce the prototype which can monitor insulators and their health to without harming human life and using less time and resources. By using the quad-copter and sensors we are performing this task. Temperature and humidity sensors are used to monitor the health of the system and its environment. Quad copter is used for capturing images of the system and insulator. We are performing image processing on the images of insulators to detect the faults in insulators which we captured via drone.

Project Objectives

Surveillance of power system in real time using quad copter and environment condition around the system in real time.

Project Implementation Method

We use quad copter as a tool to capture images of the power system specially. Small sensor box is install in quad copter for the humidity around the system and temperature of the system. Matlab is used for images processing on the images we get from drone. By analyzing the different results we design a chart for comparison among the faulty and good one insulators. Humidity and temperature reading is used to analyses the further characteristics of the system.

Benefits of the Project

  • Reduce human effort.
  • Time saving.
  • Maximize monitoring efficiency.
  • Environmental analysis around power system.
  • Reduce human resources.

Technical Details of Final Deliverable

By using this prototype we can monitor the Power system and avoid future disturbance in power distribution. This prototype is just an idea to provide better way for the surveillance of distribution system. This prototype can be enhance in future by using many different ways.

Final Deliverable of the Project

HW/SW integrated system

Type of Industry

Energy , Telecommunication

Technologies

Internet of Things (IoT), Robotics, Others

Sustainable Development Goals

Good Health and Well-Being for People, Decent Work and Economic Growth, Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
drone Equipment17000070000
sensor Miscellaneous 310003000
Total in (Rs) 73000
If you need this project, please contact me on contact@adikhanofficial.com
0
146
Emotion Detection and face classification during online exam

Due to covid-19 many education institutions fall down because they don?t have the best onl...

1675638330.png
Adil Khan
1 year ago
Cascade Inverters for High Power Switching Amplifier

In a sonar imaging system, the transducer is supplied with a higher voltage, converts the...

1675638330.png
Adil Khan
1 year ago
COVID Alert Application

Because of its constant structural change and the lack of appropriate antidotes, the coron...

1675638330.png
Adil Khan
1 year ago
Design and Implementation of Real Time Human Detection & Tracking...

The main objective of the proposed project is to design and implement a real time human de...

1675638330.png
Adil Khan
1 year ago
Development of an AI based Android App for disease detection using blo...

Among many other diseases that can be diagnosed using a Microscope, Malaria is one of them...

1675638330.png
Adil Khan
1 year ago