Power Guard

Energy distribution companies have different partners in Pakistan, like HESCO, LESCO, MESCO, etc, for commercial and domestic usage. The consumers are facing the issue of voltage fluctuation controlling and earth leakage detection in energized lines from the supplier companies randomly. These issues

2025-06-28 16:28:50 - Adil Khan

Project Title

Power Guard

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

Energy distribution companies have different partners in Pakistan, like HESCO, LESCO, MESCO, etc, for commercial and domestic usage. The consumers are facing the issue of voltage fluctuation controlling and earth leakage detection in energized lines from the supplier companies randomly. These issues are not rare for the consumers, so the suggest/designed smart electric system based on Arduino-UNO microcontroller integrated with a real-time system, and the developed system is able to automatically control the voltage fluctuations, and current, and indicate the earth leakage.

Project Objectives Project Implementation Method

The circuit can be fundamentally divided into these stages, the first stage to make a circuit to mitigate/control voltage fluctuation issues and make it efficient by doing different experiments to make our appliances protect. The second stage of this project is to make a system that senses and controls if the problem occurs and restart the system. The third stage of this project is to make a protective system for humans because sometimes it gets shocked and the system continues working so it gets a severe injury and sometimes it causes death so this is the first and important objective of this project.

Benefits of the Project Technical Details of Final Deliverable

Technical details of final deliverables outline a project's entire scope of work, while deliverables created during earlier phases of a project are probably not selected. Our project's initial deliverables are based on the circuit design of the project and then go for the second deliverables, implementation of the circuit, and the third stage to making a “Thesis” and “Project report”. The ending phase of project deliverables can include a project business because there is a huge market that is waiting for this ‘Power Guard” device.

Final Deliverable of the Project Hardware SystemCore Industry Energy Other Industries Others Core Technology Clean TechOther TechnologiesSustainable Development Goals Industry, Innovation and Infrastructure, Partnerships to achieve the GoalRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 13750
Resistors Equipment205100
Diodes Equipment1020200
Copper Plate Equipment1500500
Choke Equipment2150300
Capacitor Equipment1010100
Capacitive Load Equipment2100200
Blub & holder Equipment2200400
LCD Equipment1300300
Arduino UNO Equipment120002000
Connecting Wires Equipment3010300
Transformers Equipment4150600
Changeover Switch Equipment1300300
Connectors Equipment10550
Switch buttons Equipment4100400
Thesis and Project Report Miscellaneous 240008000