PLC based Dates processing

From growing dates to selling dates to the customers , dates passes through washing  , drying  , oiling  and  packing  procedures .  All  these  processes  are  done  manually in interior  ,  where  the  dates    &n

2025-06-28 16:34:29 - Adil Khan

Project Title

PLC based Dates processing

Project Area of Specialization Mechatronics EngineeringProject Summary

From growing dates to selling dates to the customers , dates passes through washing  , drying  , oiling  and  packing  procedures .  All  these  processes  are  done  manually in interior  ,  where  the  dates     are    planted  in  huge  quantity .      

The focus of  the project is to perform all these four  processes automatically for saving time , labour cost , quality of dates and decreasing wastage of water and oil . The input of this prototype machine is 1-2 kg dates and output are boxesof  dates .  Quantity of dates  in  each  box Is  controlled . Project required only 1 external operator .

Project Objectives

The Project objectives include:

 The main objective of this project is to  washing the dates , drying the dates , oiling the dates and to pack  them in 0.5 kg  packaging. 

 1) To perform these  four tasks  in minimized time .

 2) To reduce dates cost .

3)  To reduce water and oil wastage .

4) To save time in the production of dates .

5)  To reduce labour cost.

Project Implementation Method

First step is to purchase all the required components .

Second step will be start manufacturing project according to the working phonomenon .

Last step will be programming and finalizing the project and to test it properly.

Benefits of the Project

-Decrease the cost of dates .

-Decrease the wastage rate of oil and water .

-Saving time .

Technical Details of Final Deliverable

The structure of project is the most techniqal part of manufacturing the project , because saving time and savinf oil and water depends on the design of the project. 

Final Deliverable of the Project HW/SW integrated systemCore Industry FoodOther Industries Agriculture , Manufacturing , Health Core Technology RoboticsOther Technologies OthersSustainable Development Goals Good Health and Well-Being for PeopleRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 50000
Machenical parts Equipment5400020000
electronic devices Equipment5400020000
other works Miscellaneous 11000010000

More Posts