Pharmlogy-A portal for pharmacy Department In university

Pharmacy is a multidisciplinary field and has the potential to bring about revolutionary changes in substantially increasing pharmaceutical production and alleviation of diseases. This project is aiming to be designed according to the needs of a pharmacy department in a university. In this project,

2025-06-28 16:34:27 - Adil Khan

Project Title

Pharmlogy-A portal for pharmacy Department In university

Project Area of Specialization Information & Communication TechnologyProject Summary

Pharmacy is a multidisciplinary field and has the potential to bring about revolutionary changes in substantially increasing pharmaceutical production and alleviation of diseases. This project is aiming to be designed according to the needs of a pharmacy department in a university. In this project, we will be developing a web-based management system to overcome the problems prevailing in the manual system. Moreover, the system will comprise a digital notice board to reduce the use of paper that has been used extensively for different announcements. The system will be entertaining three types of users i.e. administrator, faculty, and students. Each type of user will be provided with their necessary features. Admin will be capable of managing all students and faculty members. All faculty members will have their own personalized websites managed by themselves. Students will be informed of all the happenings occurring inside the department.

Project Objectives

The overall objective of this project to establish a system for the pharmacy department to improve the performance of faculty and student. To achieve this goal effectively, the following objectives will be achieved

  •     To provide easy access to information related to the department
  •      To provide a personalized website for each faculty member   
  •  To provide a system easily managed by the admins

The overall objective of this project to establish a system for the pharmacy department to improve the performance of faculty and student. To achieve this goal effectively, the following objectives will be achieved

Project Implementation Method

The agile methodology will be used for project development because it allows the developers to use a continuous iterative approach throughout the development process. It will help in making any required changes in the project and incremental development. The implementation method of the project will start from requirements gathering and proceed towards designing, development, and testing of the project. However, the project development will be done in three phases i.e. admin panel, faculty personalized website, digital screen announcement. The digital display will be connected with the administration panel so that only approved announcements will be displayed on the notice board.

Benefits of the Project Technical Details of Final Deliverable

The final deliverable will be a responsive web application having customized portals for faculty, student, and administration connected with a digital notice board. All announcements related to the department will be displayed on the notice board directly from the admin and faculty portal. The portals will be developed using HTML, javascript, and MySQL while the display will be connected via a microcontroller

Final Deliverable of the Project HW/SW integrated systemCore Industry EducationOther Industries IT Core Technology OthersOther TechnologiesSustainable Development Goals Quality Education, Industry, Innovation and InfrastructureRequired Resources
Elapsed time in (days or weeks or month or quarter) since start of the project Milestone Deliverable
Month 1Project ApprovalProject Proposal
Month 2Requirement GatheringSoftware Requirements & Specifications document
Month 3Project planning Project Approval
Month 4Designing Data Models like ERD, Flow diagrams, etc. along with Prototype for app and web
Month 5Application developmentWeb application with Faculty features
Month 6Application developmentApplication with student’s features
Month 7Notifications displayConnectivity of the digital screen with admin panel
Month 8App Completion and integrationIntegration of all modules
Month 9TestingWhole system for acceptance testing
Month 10Testing Whole system for acceptance testing
Month 11Deployment Whole system installation on site

More Posts