Monitoring of Ferranti Effect and Power Factor Improvement in a Power System

The effect in which the voltage at the receiving end of the  transmission line is more than the sending voltage is known as the Ferranti effect. Capacitance and inductance are the main parameters of the lines having a length 240km or above. When this effect occurs in long transmission lines, sh

2025-06-28 16:28:37 - Adil Khan

Project Title

Monitoring of Ferranti Effect and Power Factor Improvement in a Power System

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

The effect in which the voltage at the receiving end of the  transmission line is more than the sending voltage is known as the Ferranti effect. Capacitance and inductance are the main parameters of the lines having a length 240km or above. When this effect occurs in long transmission lines, shunt reactors compensate the capacitive VAR of the lines and therefore the voltage is regulated within the prescribed limits.

The PF is the ratio between the actual load power (KW) and the apparent load power (KVA) drawn via an electrical load. Poor power factor gives rise to many problems such as large  kVA  rating  of  the  equipment. A necessary capacitance is connected so that PF is  adjusted as close to unity as possible.Theoretically, capacitors could provide  100% of the  needed  KVAR,  however,  practically, correcting PF much nearer to unity.

Project Objectives Project Implementation Method

We are making a prototype of a transmission line and monitor ferranti effect manually and then reduce ferranti effect and also improve power factor of the system.In this prototype we are using capacitor bank and inductor bank. We will use a LCD to display voltage and current parameters to monitor ferranti effect before and after.

Benefits of the Project Technical Details of Final Deliverable

A prototype will be rpoduced for the monitoring of ferranti effect and PF. A manual improvement will be made to reduce ferranti effect and improve power factor. The project will used in lab for experiement performence lately. It will help students to better understand both ferranti effect and power factor improvement. 

Final Deliverable of the Project Hardware SystemCore Industry EducationOther IndustriesCore Technology OthersOther TechnologiesSustainable Development Goals Quality Education, Affordable and Clean Energy, Responsible Consumption and ProductionRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 45000
Current Transformer Equipment140004000
Potential Transformer Equipment130003000
Capacitor Bank Equipment3400012000
Ac Load Equipment160006000
Multimeter Equipment135003500
Soldering wire Equipment115001500
Resistor Equipment1030300
Prototype Miscellaneous 130003000
Overhead Miscellaneous 130003000
Inductor Bank Equipment320006000
LCD display Equipment112001200
Relay sheild Equipment115001500