IOT and PLC based Controlling and Monitoring of Grid Station Transformer According to Load Cycle

this project is related to automation and monitoring of grid station transformers according to load cycle by utilizing PLC and IOT technology.we have made an effrt to offer PLC based solution for scheduling of transformers at grid station according to load cycle.

2025-06-28 16:33:22 - Adil Khan

Project Title

IOT and PLC based Controlling and Monitoring of Grid Station Transformer According to Load Cycle

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

this project is related to automation and monitoring of grid station transformers according to load cycle by utilizing PLC and IOT technology.we have made an effrt to offer PLC based solution for scheduling of transformers at grid station according to load cycle.

Project Objectives

the objective of this project is scheduling of transfomers at grid station according to load cycle with the help of PLC & IOT Technology.the system design will providea systematic solution to protect transformer and fault detection using PLC, phase monitoring & temperature sensing with power management of particular distribution and give notification through GSM and information sharing with grid station through IOT technology.

Project Implementation Method

the single phase supply is given to input module of PLC.then single phase supply is also given individually to all output modules of PLC .The output modules of PLC are connected to loads(lamps,motors) through transformers.By using PLC ,the input & output elements of plant are wired up only to the inputs & outputs of controller.The program for the controlling sequence is written in the form of instructions,and just varying our software ,we can bring in changes we want.

Benefits of the Project

the PLC based transformer scheduling system can be utilize for switch on/off transformers at grid stations,switching on/off capacitors for power factor improvement,controlling the operation of breakers in KESC and WAPDA.

Technical Details of Final Deliverable

following is the main grid operation which are connected to PLC based system.

scheduling of transformers at grid station according to load cycle.

PLC is one of the major breakthrough which has taken over industrial automation very rapidly.

eventually a manned grid station in remote area can be converted into un-manned grid station.

Final Deliverable of the Project HW/SW integrated systemCore Industry Energy Other Industries Telecommunication Core Technology Internet of Things (IoT)Other Technologies RoboticsSustainable Development Goals Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 56600
PLC Equipment11500015000
Project structural designing Miscellaneous 180008000
sensors Equipment55002500
Electric motor Equipment150005000
Electronics item Equipment130003000
transformer Equipment150005000
Aluminium plate and panel Miscellaneous 110001000
Lead screw w/nut Miscellaneous 3300900
Arduino Mega Equipment112001200
HMI Equipment11500015000