GSM BASED UNDER VOLTAGE AND OVER VOLTAGE LOAD PROTECTION SYSTEM
Summary of this project includes to design a working model GSM based voltage fluctuations device to minimise loses cause by low power factor in a supply and by which amount of power is going to be wasted the main point or theme of this project is to satisfy the household consumers needs for efficien
2025-06-28 16:27:31 - Adil Khan
GSM BASED UNDER VOLTAGE AND OVER VOLTAGE LOAD PROTECTION SYSTEM
Project Area of Specialization Electrical/Electronic EngineeringProject SummarySummary of this project includes to design a working model GSM based voltage fluctuations device to minimise loses cause by low power factor in a supply and by which amount of power is going to be wasted the main point or theme of this project is to satisfy the household consumers needs for efficient power utility .thereby offering longer service life and quality services to household equipments further more this project is highly acceptable in the Society.
Project ObjectivesMain object of this project is to design and simulate over and under voltage fluctuations for electrical equipments. By analysing multiple factors that are related to voltage fluctuations .finally again to setup and design a model related with many parameters to make safe costly and precious equipments that matters economically to a consumer.
Project Implementation MethodThis project will be implement in the following map outed rout. First we will go through briefely by previous work done in many forms like litterature review block diagrams ,flow chart,simulations and finally to present the designed Model and its working physically.
Benefits of the ProjectThis project is applicable to protect heavy and most expansive electrical and electronic devices in a safe way.the most beneficial point of this idea is that it can be controlled remotely where we have to stand by all the time as voltage fluctuation is a heigh disturbing action finally we can get the benifit to controlle far away installed electrical set up like remote island installations.
Technical Details of Final DeliverableIt will include a working model to run physical to check the tittled estimation comprised of multiple sensors and basic electrical components the final efficiency calculation will be carried out along with simulation .
Final Deliverable of the Project Hardware SystemCore Industry SecurityOther IndustriesCore Technology Internet of Things (IoT)Other TechnologiesSustainable Development Goals Affordable and Clean EnergyRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 57200 | |||
| Arduino | Equipment | 2 | 6000 | 12000 |
| 8051 microcontroller | Equipment | 1 | 1000 | 1000 |
| Crystal oscillator | Equipment | 2 | 500 | 1000 |
| PCB & bread boards | Equipment | 2 | 500 | 1000 |
| Diodes | Equipment | 10 | 300 | 3000 |
| IC,s | Equipment | 8 | 200 | 1600 |
| LCD display | Equipment | 2 | 1000 | 2000 |
| Transformer | Equipment | 4 | 1000 | 4000 |
| Adapter | Equipment | 1 | 500 | 500 |
| Ic socket | Equipment | 6 | 100 | 600 |
| Push button | Equipment | 4 | 100 | 400 |
| Lamp | Equipment | 2 | 1000 | 2000 |
| Switch | Equipment | 4 | 500 | 2000 |
| LEDs | Equipment | 5 | 300 | 1500 |
| Cables and connector | Equipment | 8 | 700 | 5600 |
| Sim 800 GSM module | Equipment | 1 | 2000 | 2000 |
| Capacitor | Equipment | 4 | 1000 | 4000 |
| Resistor | Equipment | 5 | 500 | 2500 |
| Sim | Equipment | 1 | 500 | 500 |
| Report print, photocopy etc | Miscellaneous | 1 | 10000 | 10000 |