GSM BASED UNDER VOLTAGE AND OVER VOLTAGE LOAD PROTECTION SYSTEM

Summary of this project includes to design a working model GSM based voltage fluctuations device to minimise loses cause by low power factor in a supply and by which amount of power is going to be wasted the main point or theme of this project is to satisfy the household consumers needs for efficien

2025-06-28 16:27:31 - Adil Khan

Project Title

GSM BASED UNDER VOLTAGE AND OVER VOLTAGE LOAD PROTECTION SYSTEM

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

Summary of this project includes to design a working model GSM based voltage fluctuations device to minimise loses cause by low power factor in a supply and by which amount of power is going to be wasted the main point or theme of this project is to satisfy the household consumers needs for efficient power utility .thereby offering longer service life and quality services to household equipments further more this project  is highly acceptable in the Society.

Project Objectives

Main object of this project is to design and simulate over and under voltage fluctuations for electrical equipments. By analysing multiple factors that are related to voltage fluctuations .finally again to setup and design a model related with many parameters to make safe costly and precious equipments that matters economically to a consumer.

Project Implementation Method

This project will be implement in the following map outed rout. First we will go through briefely by previous work done in many forms like litterature review block diagrams ,flow chart,simulations and finally to present the designed Model and its working physically.

Benefits of the Project

This project is applicable to protect heavy and most expansive electrical and electronic devices in a safe way.the most beneficial point of this idea is that it can be controlled remotely where we have to stand by all the time as voltage fluctuation is a heigh disturbing action finally we can get the benifit to controlle far away installed electrical set up like remote island installations.

Technical Details of Final Deliverable

It will include a working model to run physical to check the  tittled estimation comprised of multiple sensors and basic electrical components the final efficiency calculation will be carried out along with simulation .

Final Deliverable of the Project Hardware SystemCore Industry SecurityOther IndustriesCore Technology Internet of Things (IoT)Other TechnologiesSustainable Development Goals Affordable and Clean EnergyRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 57200
Arduino Equipment2600012000
8051 microcontroller Equipment110001000
Crystal oscillator Equipment25001000
PCB & bread boards Equipment25001000
Diodes Equipment103003000
IC,s Equipment82001600
LCD display Equipment210002000
Transformer Equipment410004000
Adapter Equipment1500500
Ic socket Equipment6100600
Push button Equipment4100400
Lamp Equipment210002000
Switch Equipment45002000
LEDs Equipment53001500
Cables and connector Equipment87005600
Sim 800 GSM module Equipment120002000
Capacitor Equipment410004000
Resistor Equipment55002500
Sim Equipment1500500
Report print, photocopy etc Miscellaneous 11000010000