GSM based Hybrid Geyser with Automatic Switching

We area proposing the idea of Hybrid geyser, that can be operated on four sources. These sources comprises of Solar-energy, line gas, CNG gas, Electric city. This geyser will automatic switch to particular source ann this switching is on priority basis. T

Project Title

GSM based Hybrid Geyser with Automatic Switching

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

We area proposing the idea of Hybrid geyser, that can be operated on four sources. These sources comprises of Solar-energy, line gas, CNG gas, Electric city. This geyser will automatic switch to particular source ann this switching is on priority basis. The priority will rely on reliability, efficiency, cost-effectiveness of the sources, if any of one sources is not available or any source is not working sufficiently, than the geyser will switch to other available sourcesource among the listed sources. Although, if two sources are available at a time, than the geyser will be switch automatically on the basis of cost and priority. The system is self-regulating. If water temperate at high degree than geyser will be switched off by itself. The most feasible benefit of geyser is, we can intervene the status through notification or mail on our mobile phone through GSM.

Project Objectives

Objective.

  • Difficulty to get Hot water in remote areas:

 Northern areas and other under-developed areas face load sheding frequently. So these areas do not have enough resources to get hot water. Our aim is to develop a hybrid geyser so to reduce  pain and miseries people of these areas face to get hot water.

  • Cost effective:

If we use each geyser with specific source than it require high cost, so hybrid geyser contain four sources which ultimately reduce our cost.

  • Reducing CO2 emission;

If we use wood and gas to get hot water than the emission of CO2 pollute our environment, that’s why

Hybrid geyser is designed to control the emission of CO2.

  • So a hybrid geyser is also a solution to reduce deforestation.As in remote areas, people cut trees for heating water for daily use.

Project Implementation Method

For saving the nonrenewable source, maintaining the efficiency and making cost effective we are proposing a hybrid geyser that will be operated on priority basis. The priority will be in the following order:

  • Solar
  • Line gas
  • LPG (propane)
  • Electricity (wapda)

Different sensors will be installed like temperature, pressure sensor, and flow sensor, for helping to automatically switch between sources. A GSM module will be integrated with aurduino to inform the user about the status of the hybrid geyser.

The work is divided in two phase:

For the first phase number of sensors will be interfaced with the arduino enviornment and simulation will be done.

In the second we will work on the final prototype of the project.

Benefits of the Project

  • Energy efficient and clean tech.
  • Reduced CO2 emmision.
  • Cost effective.
  • Save non-renewable sources.
  • user friendly

Technical Details of Final Deliverable

We are going to develop a hybrid geyser which will wave automatic switching between different sources depending upon the priorities. 

1: CT sensor will measure the amount of current and will send data to arduino for solar power and wapda.

2: Pressure sensor and gas flow sensor will detect and measure the parameters of LPG and line gas.

3: Consequently the Temperature sensor will continuously determine the the temperatue of water. after the set is reached all power sources will be turned off.

4: From the data given by these sensors and transducer our program wil:

  •  Control the geyser
  •  Switch between sources
  •  Deliver the status through GSM module. 

Final Deliverable of the Project

Hardware System

Core Industry

Manufacturing

Other Industries

Core Technology

Clean Tech

Other Technologies

Sustainable Development Goals

Industry, Innovation and Infrastructure, Responsible Consumption and Production, Climate Action

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
arduino Equipment164006400
geyser tank/cylinder Equipment11800018000
solar panel (350 watt) Equipment21500030000
Dc heating Equipment132003200
LPG regulator Equipment114001400
GSM module Equipment140004000
ct sensor Equipment25001000
solenoid valve Equipment215003000
gas flow sensor Equipment214002800
others Miscellaneous 190009000
Total in (Rs) 78800
If you need this project, please contact me on contact@adikhanofficial.com
0
126
Smart Kit For Visually Impaired People

Our project "Smart Kit For Visually Imapired People" is a  of Glasses and stick.This...

1675638330.png
Adil Khan
1 year ago
Automatic Plant Irrigation System

We had made a system for the proper water supply in the field. It is basically a system wh...

1675638330.png
Adil Khan
1 year ago
Healthtech App

The Healthcare industry is one of the oldest industries and the basic administrative struc...

1675638330.png
Adil Khan
1 year ago
Smart Security System Using IOT

The system provides parking facilities in real-time and users are able to reserve places a...

1675638330.png
Adil Khan
1 year ago
Autonomous Unmaned Aerial Vehicle for Smart Farming

   Unmanned Aerial Vehicle (UAV) has emerged in the global remote sensing commun...

1675638330.png
Adil Khan
1 year ago