Goal Structuring Notation for Engineering Safety Case

?Goal Structuring Notation for Engineering Safety Case? is a tool that is unambiguous, structured, efficient and mature approach to develop and present safety arguments. This tool will define the limitations and standards and fulfill the requirements which an individual need to get

Project Title

Goal Structuring Notation for Engineering Safety Case

Project Area of Specialization

Shared Economy

Project Summary

“Goal Structuring Notation for Engineering Safety Case” is a tool that is unambiguous, structured, efficient and mature approach to develop and present safety arguments. This tool will define the limitations and standards and fulfill the requirements which an individual need to get for their goal and give a way to provide better solutions. GSN explicitly represents the individual elements of any safety argument (requirements, claims, evidence and context) and relationships that exist between these elements.

The use of GSN has arisen in response to poorly written Safety Case documents. Such safety documents may easily become lengthy and obtuse for users through poor use of English and it becomes hard to tackle a common weakness in technical and complex arguments. Due to the amount of manual work, constructing a safety case is usually time-consuming and lacks clarity in written documents.

Therefore, A Goal Structuring Notation (GSN) tool is presented to support a user to draw a structure of engineering arguments and Data flow while taking technical arguments and following standards. The tool has basic GSN shapes and providing the services of data flow in technical and critical arguments, and a mature drawing tool.

Project Objectives

Objectives are:

  • Reduce implications of faulty safety cases
  • Reduce training work
  • Reduce health concerning issues.
  • Improve authentication and correction of mistakes 
  • increase efficiency and effectiveness.

These above objectives are achieved by GSN tool features i.e.:

  • Team Management.
  • File import/export in .png and .dmo extensions.                
  • Guided and Restricted drawings by GSN standards for safety cases.

Project Implementation Method

Algorithm:

1) START

2) Identify goals.

3) Identify sub-goals, if more than one goal.

4) Identify strategies, if more than one then repeat this step until completed.

5) Identify solutions, if more than one solution then repeat this step until completed.

6) Check goal is achieved.

7) Go to step 3 for remaining goals.

8) END. 

Flowchart:

Benefits of the Project

  • GSN is increasingly being used in safety-critical industries and in every engineering field where safety is concerned.
  • GSN improves the comprehension of the safety argument amongst all of the key project stakeholders (i.e. system developers, safety engineers, independent assessors and certification authorities).
  • It visualizes an argument structure that supports a claim to be true.
  • It provides the spell check feature of every written argument.

Technical Details of Final Deliverable

“Goal Structuring Notation for Engineering Safety Case” is a tool that is unambiguous, structured, efficient and mature approach to develop and present safety arguments. This tool provide standard and limitations on these standards for better work. This tool has home page, user manual for user guidance and GSN tool that is used to develop safety cases in every field of engineering. GSN tool provide us login and sign up page for users. After login we can use the tool. We draw safety case, tool will provide restrictions on each standard. We specify unique keyword for each standard. When we follow the restriction then we can proceed to drag the next element of GSN tool.

 This tool has color scheme. We can change background color, text color, font size canvas size (height and width). After draw safety case we can save, import, export and open the safety case diagram for future use.

In setting feature, registered user can also change its password. We can add unregistered user users by the registerd user for team work. 

Final Deliverable of the Project

Software System

Type of Industry

IT

Technologies

Shared Economy

Sustainable Development Goals

Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Domain and hosting Equipment3500015000
Publication Fee Equipment12000020000
Survey travel cost Miscellaneous 240008000
internet cost Miscellaneous 120002000
Total in (Rs) 45000
If you need this project, please contact me on contact@adikhanofficial.com
Connected Greenhouse using IoT

The name connected greenhouse suggests itself that all the measurements and information is...

1675638330.png
Adil Khan
9 months ago
Robot Controlled by Human Gestures

Nowadays, robots are increasingly being integrated into working tasks to replace humans sp...

1675638330.png
Adil Khan
9 months ago
solid waste complaint management system

We all travel almost every day to different locations with in city and some time to other...

1675638330.png
Adil Khan
9 months ago
To Enhance the Safety Precautions in Industrial Shredder Machine.

Industrial Shredders are high powered machines used to crush materials in advance of dispo...

1675638330.png
Adil Khan
9 months ago
Digital notifier panel

SUMMARY OF THE PROJECT: Notice boards are playing a very important role in our day to day...