The Optimized Scheduling System for Aircrafts Maintenance is a platform to generate an optimized schedule on runtime. Our scheduler will be based upon Genetic algorithms. It is an industry-based project with the affiliation of CARE. This Software will be efficient in rescheduling and monitoring
Genetic Algorithm Based Optimized Scheduling System For Aircraft Maintenance
The Optimized Scheduling System for Aircrafts Maintenance is a platform to generate an optimized schedule on runtime. Our scheduler will be based upon Genetic algorithms. It is an industry-based project with the affiliation of CARE. This Software will be efficient in rescheduling and monitoring the overall plan according to the requirements.
Completion of requirements for this project through meetings with clients
Analyzation and research of gathered requirements.
Planning of the project.
Implementation of Flow charts.
Designing of the project modules on the basis of requirements gathered.
Implementation of the modules.
Integration of all modules.
Testing of the entire project for the verification of any type of malfunctions and bugs.
Deployment of the project.
Algorithm:
Optimization
APIs
Genetic Algorithm
Backend:
Database (MS SQL/Oracle)
C++
Frontend:
React or Node JS
AOs
User Interface
MRO Deployment (Team Selection)
MRO Operations (Repair of Aircraft)
MRO Scheduling (Repair Schedule)
Visualization
Gantt Charts
Production Schedules
The project will provide a fully computerized optimization of time schedule for the maintenance of aircraft. It will also help to increase productivity from 10 to 15 percent. Our software will predict the time/duration of tasks Which will help in saving time.
Algorithm:
Optimization
APIs
Genetic Algorithm
Backend:
Database (MS SQL/Oracle)
C++
Frontend:
React or Node JS
AOs
User Interface
MRO Deployment (Team Selection)
MRO Operations (Repair of Aircraft)
MRO Scheduling (Repair Schedule)
Visualization
Gantt Charts
Production Schedules
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| laptop | Equipment | 4 | 15000 | 60000 |
| zong internet | Equipment | 1 | 2500 | 2500 |
| Total in (Rs) | 62500 |
The project is about developing an artificial intelligence-based design to control the mov...
According to world health organization(WHO) millions of people are going through visual im...
Our aim is to design a system that based on Internet Of Things(IOT) that will collect the...
The use of robotic manipulators is essential to modern industry for tasks involving human...
In this table reservation system we?ll be using conductive paints and Touch board. We will...