It is a research base project that prevents Students from cheating also can be called an Anti- cheat application, which can be implemented in any examination centre or hall. The invigilator will get notified on his/her smart device (laptop/ smart phone) about any unusal activity, or behavior h
Exam Over-Watch
It is a research base project that prevents Students from cheating also can be called an Anti- cheat application, which can be implemented in any examination centre or hall. The invigilator will get notified on his/her smart device (laptop/ smart phone) about any unusal activity, or behavior happening in the examination hall.
Deep Neural Network (DNN) Machine Learning algorithms will the used on the camera which will live stream the examination hall. Detecting Student's movement by angle detection and detect sign language (By gesture). The live stream will go into servers, where it will be classified on different classes (i.e) class A for angle movement and Class B is for sign language, which will then get saved in database. The database log will contain the cheating techniques, students name and Roll Number. The class he was sitting in and the invigilator's name. Admins can make filterd reports from it which can be helpful in determining which student was caught cheating several times and in which class he or she was sitting, under which invigilator's supervision.
The invigilator will login himself/herself in the application and will provide with details of the class in which he or she is invigilating. The student data will be stored in database which will tell about the student's Roll Number and the seat he or she was sitting. The invigilator will get notified through application for any unusual behaviour.
The main objective of the project is to refrain students from cheating, enhance educational system and improve the invagilation.
We will implement our project through waterfall model. Phases of implemented method as follows:
1. Requirement gathering and Analysis: All possible requirements of the system to be developed are captured in this phase and documented in a requirement specification document.
2. System Design: The requirement specifications from first phase are studied in this phase and the system design is prepared. This system design helps in specifying hardware and system requirements and helps in defining the overall system architecture.
3. Coding / Implementation: With inputs from the system design, the system is first developed in small programs called units, which are integrated in the next phase. Each unit is developed and tested for its functionality, which is referred to as Unit Testing.
4. Integration and Testing: All the units developed in the implementation phase are integrated into a system after testing of each unit. Post integration the entire system is tested for any faults and failures.
5. Deployment of system: Once the functional and non-functional testing is done; the product is deployed in the live environment.
The core benefit of the project is:
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Motion Detection Wifi IP Camera Full HD 2 | Equipment | 3 | 10000 | 30000 |
| Domain name | Miscellaneous | 1 | 2000 | 2000 |
| Hosting | Miscellaneous | 1 | 4000 | 4000 |
| Printing | Miscellaneous | 4 | 1000 | 4000 |
| CCTV-Camera with Sensors | Equipment | 2 | 10000 | 20000 |
| Total in (Rs) | 60000 |
The main purpose of this project is to find a solution for the railway line crossings on t...
MOSFET is a key component for high frequency and high efficiency switching applicati...
Public Transportation System have received much attention in recent years in academia, and...
Drowsiness & dizziness are leading causes of traffic and industrial accidents, costing...
In today's fast-changing business environment, it's extremely important to be able to resp...