Introduction M-1 is a battery-operated one-person capacity E-bike/ E- scooter [vehicle] that is specially designed for : University / college student those are mobile inside uni-campus or nearby, includes both male and female.
E-Bike
Introduction
M-1 is a battery-operated one-person capacity E-bike/ E- scooter [vehicle] that is specially designed for :
OBJECTIVE?S
The project focuses on the need to electrify the auto-industry in order to promote an eco-friendly environment.?
It is part of the ambitious Pakistan Electric Vehicle Policy 2020-2025, the aim of which is to bring about a green revolution in Pakistan and reduce the carbon footprint especially in mega cities.?
Fabrication model development of single seater electric scooter.?NIVERSITY
In the first phase of the project cycle, we are trying to meet the expectations of management, clients and key stakeholders. The project manager may want to hold an initial meeting to outline everyone's assigned roles and the expected timeline, as well as any project milestones that a team works toward in the implementation phase.
With a plan in place and expectations set for the team, it's time to start work on the project. During this step, project managers had regular discussions with the team about their progress. We measured the project's timeline against the projected schedule and monitor resources to ensure the team had what they need to complete the project successfully. Communication wass instrumental during this part of the process to keep the team aware of the project's priorities. It's was also important to provide regular progress updates to the administration.
During the project neccessary adjustments have been done accoring to the model we had done, relying on the project plan to identify solutions. Change is a reality for the project and how effectively the project manager implemented those changes affected the project's outcome.
Throughout the implementation phase of the project, we analyzed data consistently to measure how it was progressing against the initial projections. We use specific project management software or a manual system to compile data related to staffing, resources and budget.
At the last reports will be provided by the project team, to clients and stakeholders outlining how the project performed against the projected budget and timeline. These reports include the applicable data related to the project's budget, time and resources.
1 – More Sustainable.
2 – Cheaper Purchase Cost.?
3 – Lower Running Costs.
4 – Excellent Accessibility?
5 – Easy Storage
6 – Simple Transportation.?
7 – Higher Security
8 – Health Benefits?
Those used includes:?
Hub motor 1000W?
Li-ion Battery? 48volt / 20 ah /
Controller?
Throttle ?
DC-DC converter?
Speedometer/LED?
Rear Disc Brake?
Other assembly parts?
Metal to Design Frame
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Hub motor 1000W? | Equipment | 1 | 20000 | 20000 |
| Li-ion Battery? | Equipment | 1 | 25000 | 25000 |
| Controller? | Equipment | 1 | 6500 | 6500 |
| Throttle | Equipment | 1 | 1000 | 1000 |
| Frame | Equipment | 1 | 15000 | 15000 |
| tires | Equipment | 1 | 2500 | 2500 |
| Others | Miscellaneous | 1 | 9999 | 9999 |
| Total in (Rs) | 79999 |
This project is the extraction of electronics and mechanics. It is based on 3-D printing t...
Metamaterial Absorber is a type of metamaterial intended to efficently absorb electro...
The number of vehicles is expanding rapidly. In this way, the workload on traffic cops is...
We are making an autonomous vehicle which will work on the basis of artificial intelligenc...
The project will be an android application which will implement the option of visual searc...