Adil Khan 1 year ago
AdiKhanOfficial #FYP Ideas

Design Efficiency through BIM

The project involves the application of building information modelling (BIM) technology for delivery of sustainable infrastructure through design efficiency. BIM is a revolutionary technology enabling efficient project feasibility for sustainable infrastructure delivery. It provides a collabora

Project Title

Design Efficiency through BIM

Project Area of Specialization

Information & Communication Technology

Project Summary

The project involves the application of building information modelling (BIM) technology for delivery of sustainable infrastructure through design efficiency. BIM is a revolutionary technology enabling efficient project feasibility for sustainable infrastructure delivery. It provides a collaborative platform for all project participants for real time improvements and corrections prior to start of construction. Integration of BIM with virtual reality (VR) is an innovative idea which can provide for efficient and informed decision-making by participants based on real time experience of end deliverable before construction even begins. For this project, a working model of BIM integrated with VR will be developed for infrastructure project.

When employed for delivery of sustainable product, the model can provide an efficient solution based on custom project constraints providing serious cost and time savings. As the client can experience the end product before its making through linking the 3D developed model with VR, this can result in increased stakeholder satisfaction crucial to project success. The end model of the infrastructure project when designed in line with the international sustainability standards like those provided by UN, ISO, LEEDS and UNEP/SETAC organizations can direct result in improvement of performance of several sustainable development goals especially sustainable infrastructure delivery and provision of sustainable communities.

Project Objectives

1. BIM and VR based model development for a suitable

    infrastructure project. 

2. Structural analysis and clash detection for the developed

    model

3. Sustainability based improvements in the model for

    application to Pakistan

4. Integrated BIM and VR based-Working Model for

    Sustainable Instructure Projects in Pakistan

Project Implementation Method

The project methodology includes the following steps:

  1. Literature Review and software learning
  2. Selection of a suitable project site.
  3. Using data from project documents and project participants define the main complex problems in the project.
  4. Development of 3D BIM model of infrastructure project using Auto Desk Revit 3D.
  5. Structural Analysis and Clash Detection of the developed model using a Revit plugin called Robot Structural Analysis. 
  6. Linking the BIM model with VR device for integrated working model development using Samsung VR Device.
  7. Comparison with various sustainability codes 
  8. Results and Discussion

Benefits of the Project

The project will help serve the ICT, construction and transportation industry in terms of improved technology application. Currently, these sectors are facing severe innovation bottlenecks and are in dire need for practice improvements. Using BIM and VR, which are advanced ICT applications for development of infrastructure can result in various advantages:

  1. Cost, time and efficiency savings during project delivery
  2. Lower social and environmental damages during project construction
  3. Efficient collaboration of project participants providing improved collaboration and communication avoiding various project conflicts and litigation
  4. Due to predictive modelling of the end deliverable, various issues can be avoided causing serious problems during project implementation
  5. The working model can serve as a one stop guide for the market practitioners looking to improve sustainability performance of high budget projects
  6. Improvement in Pakistan economical condition due to improved design efficiency in the projects.
  7. Major breakthrough in ICT application for various projects with application in sectors like construction, manufacturing, IT, healthcare, etc.

Technical Details of Final Deliverable

Our final year project delivery will be in the form of a working model for virtual reality experience of infrastructure projects for feasibility analysis. Based on that, structural improvements will be introduced comparing it with sustainability standards and an optimized design framework for maximum design efficiency will be suggested.

Final Deliverable of the Project

Software System

Core Industry

IT

Other Industries

Finance , Transportation , Others

Core Technology

Clean Tech

Other Technologies

Others

Sustainable Development Goals

Industry, Innovation and Infrastructure, Sustainable Cities and Communities, Partnerships to achieve the Goal

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Smart Devices and Screens Equipment4870034800
Printing and Stationary Miscellaneous 140004000
Overheads Miscellaneous 160006000
Hard Drive (Electronics) Equipment160006000
Virtual Reality Gear Equipment12000020000
Total in (Rs) 70800
If you need this project, please contact me on contact@adikhanofficial.com
0
184
IoT based Radiation Warning System for Patient

This project is about development of a low cost Electromagnetic waves monitoring system us...

1675638330.png
Adil Khan
1 year ago
IOT Underground Cable Fault Detector

Underground cables are being utilized for the advancement of intensity framework matrix. T...

1675638330.png
Adil Khan
1 year ago
Automatic Object Sorting and Classification

In this advance era, automatic sorting is highly desirable in approximately every industry...

1675638330.png
Adil Khan
1 year ago
Hybrid Bike

Hybrid bike project is a project which is chosen keeping in veiw about the current situati...

1675638330.png
Adil Khan
1 year ago
Wireless Powered Embedded Cardiac Pacemaker apart Utilization of Reson...

Our Essential design challenges include power efficiency of an inductive link that reliant...

1675638330.png
Adil Khan
1 year ago