Design and Fabrication of Cooling Tower

In the last few years, there has been a greater demand for consumption of energy which has led to the development of energy efficient policies aiming to reduce the emissions by carbon dioxide. Cooling towers are energy efficient devices operating at a low-level water temperature and are designed to

2025-06-28 16:26:20 - Adil Khan

Project Title

Design and Fabrication of Cooling Tower

Project Area of Specialization Mechanical EngineeringProject Summary

In the last few years, there has been a greater demand for consumption of energy which has led to the development of energy efficient policies aiming to reduce the emissions by carbon dioxide. Cooling towers are energy efficient devices operating at a low-level water temperature and are designed to ensure that maximum contact between water and air occurs. These devices lower the temperature of circulating water so that the water can be used in heat exchange equipment as well as condensers. Cooling towers are used in power plant and refineries sectors. The major applications of cooling tower are in Heat Ventilation and Air Conditioning (HVAC) systems. Cooling towers are installed in pharmaceutical companies, laboratories, chemical industries, power generation etc. they are divided into natural draft cooling towers(NDCT) and mechanical draft cooling towers(MDCT). The purpose of this project is to design and fabricate an induced draft tangential flow cooling tower ()and to determine the effect of the cooling tower (CT) ,  by using various parameters including wet bulb temperature, relative humidity and other important parameters. By using the fundamental experiment methods like Fluid Dynamics, Thermodynamics and some other methods, important parameters are determined. Moreover, by changing efficiency and effectiveness and with different inlet water temperature, factors such as range, approach and L/G ratio were also determined.

Project Objectives Project Implementation Method

This project is divided into four phases:

PHASE 1 : DATA COLLECTION AND RESEARCH 

Before starting any project,it is important to understand what the project actually is and without adequate research it is not possible to carry out furthur work.This phase is one of the most important and is the backbone of the project.

PHASE 2 : SELECTION OF DESIGN PARAMETERS AND DESIGN CALCULATIONS

For any project,design is the most important parameter before carrying out fabrication.This phase includes extensive research and selecting appropriate parameters which will later be used when performing calculations.AUTOCAD modelling is also being done here.

PHASE 3 : FABRICATION

Once design parameters and calculations are completed,the next phase is the fabrication of the cooling tower.Here, the fabrication parameters are listed down and any safety considerations in design is mentioned.

PHASE 4 : FUTURE WORKS 

After the project is completed,it is important to see whether the project performs its intended function or not.For this reason,testing phase will be carried out in which any remaining error will be checked for and eliminated so that the project is fully functional.Performance enhancement will also be carried out and it is intended that the project serves beneficial in the near future.

Benefits of the Project

This project serves benefical in many ways.

Technical Details of Final Deliverable Final Deliverable of the Project Hardware SystemCore Industry Energy Other IndustriesCore Technology Clean TechOther TechnologiesSustainable Development Goals Responsible Consumption and ProductionRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 80000
PVC Fills Equipment12200022000
G.I/PVC Eliminator Equipment11000010000
G.I Louvers Miscellaneous 120002000
G.I Construction Equipment11000010000
12' dia sheet metal impeller MS Miscellaneous 110001000
Mono block motor 1/2 hp Miscellaneous 120002000
Water distribution system Miscellaneous 150005000
Aluminium structure and G.I Powder coated panels Equipment12800028000

More Posts