Design & Implementation of Prototype for Monitoring and Controlling of Substation using PLC & HMI

Major problems of existing sub stations are manual control, no secondary protection system and use of wired mechanism etc. In existing system,  a technical operator is required near the substation who turns switchgears ON and OFF manually. In case of failure of primary or main

2025-06-28 16:31:08 - Adil Khan

Project Title

Design & Implementation of Prototype for Monitoring and Controlling of Substation using PLC & HMI

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

Major problems of existing sub stations are manual control, no secondary protection system and use of wired mechanism etc.

  1. In existing system,  a technical operator is required near the substation who turns switchgears ON and OFF manually. In case of failure of primary or mains protection there is no backup to compensate this problem.
  2. In existing system, with manual switching, there is a high chance of error occurrence. It is also harmful for operator because incorrect interlocking can flash the equipment and it will also damage the other connected sensitive and highly cost apparatus. To control these equipment’s manually, wired systems were too massive to be planned.
  3. In existing substation, lack of proper monitoring with a single interface to provide all necessary parameter of power system on screen.

The above mentioned complications are tackled by having “PLC and HMI system” in substation. In substation key complication is that when fault occurs at substation, current system sometimes does not identify fault, existing relay based system takes extra time to trip, sometimes does not generate alarms and have no human machine interface for optimal interfacing with substation equipment’s. Additionally, we are using a special switching mechanism to operate switchgear at substation such as isolator works as OFF load device and circuit breaker works as ON load devices.

Project Objectives

Major objectives of work:

  1. Secondary Protection.
  2. Automatic Interlocking.
  3. Automatic Monitring and Controlling.
  4. Interfacing View Of  The System.
  5. Load Protection according to Current rating.
Project Implementation Method

This Implementation of this project is based on secndary protection & monitoring and controlling of interlocking isolator, circuit breaker and earth switch on a three phase system with single bus bar arrangement. PLC programmed to control the interlocking of these switch gears working principles and monitoring with the help of HMI. Using C.T. and P.T, voltage, current, power factors and other factor related to a power system is being monitored. HMI will provides us with a optimize interface that interact with system and if any fault or disturbance occurs to the system and switch off the system on its own.On load side,in case of overload condition the load is triped as it exceeds its rating.This system provides us the moniting and controling of single phase load  as well as for three phase load on basis of their current ratings.This system provide us with a full control over substation system and will overcome the old-fashioned system.

Benefits of the Project

There are some benefits of using this system in the substation automation.

1-PLCs and HMIs based system required less time as compared of relay wired system.

2- Automating Tripping of the faulty part and HMI will provides us with a fault location.

3- Provides automatic switching of isolator which is done manually in substations.

4- Provide us with a full control over substation system as well as on single phase loads and e phase load.

Technical Details of Final Deliverable

Three phase supply                         380V

Average Current on  Bus bar          8-10 A

Supply for relays/contactor              220

DC supply                                           24v

Load (3)                                         Load 1: 3-phase Induction                                                         Motor (0.75kw)

                                                        Load 2: 2-Bulbs(0.1kw*2)

                                                         Load 3: 2-Bulbs(0.1kw*2)

Final Deliverable of the Project HW/SW integrated systemCore Industry Energy Other Industries Others Core Technology OthersOther TechnologiesSustainable Development GoalsRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 75221
PLC Equipment11250012500
HMI Equipment11850018500
PLC Programming cable Equipment127002700
Power analyzer Equipment194419441
Circuit breaker Equipment240008000
Current transformer Equipment33501050
Magnetic contactor Equipment418007200
Relays Equipment62501500
Relay base Equipment650300
Insulator Equipment630180
Bus bar Equipment38002400
Wire Equipment28902520
Breaker channel Equipment18080
Board Equipment08000
Over load relay Equipment39502850
Traveling Miscellaneous 160006000