The ?River Cleanup System? utilized in that locations where-in there is waste particles in the water body which are to be eliminated. This gadget consists of waterwheel driven conveyer mechanism which collect & take away the wastage, rubbish & plastic wastages from water bodies. This also re
2025-06-28 16:26:06 - Adil Khan
Design & Fabrication of a fast track automatic Lake Cleaning Machine
Project Area of Specialization Mechanical EngineeringProject SummaryThe “River Cleanup System” utilized in that locations where-in there is waste particles in the water body which are to be eliminated. This gadget consists of waterwheel driven conveyer mechanism which collect & take away the wastage, rubbish & plastic wastages from water bodies. This also reduce the problems which we face when collection of debris take vicinity. A device will lift the waste surface debris from the water our bodies, this will in the long run bring about reduction of water pollution and ultimately the aquatic animal's demise to those troubles might be reduced. It includes belt power mechanism which lifts the debris from the water. The use of this venture could be made in rivers, ponds, lakes and different water our bodies for to clean the floor water debris from bodies.
Project ObjectivesThere are few major objectives that we will cover in our Final Year Project (FYP), that is to reduce man power and time consumption for cleaning the lake, to provide the facility of removing waste particulate floating on water surface, and to make environment more suitable for everyone including humans and marine animals.
Project Implementation Methodimplementation will be on bigger scale that is we will make the scale up model for the desired place or lake. We'll be doing doing everything under our team observation and guidence
Benefits of the ProjectBasically, It is beneficial to our enviroment as well as the aquatic life. Also permotes tourism by providing clean enviroment.
Technical Details of Final DeliverableBasically, it will be a fully designed and modified project that does not need any kind of petroleum energy for its working all we need is batteries which we can further modifies it by giving solar power. That does not need much maintance or we can say that its one time investment. The machine will be able to collect all the waste on water surface or 2-4ft below water surface. which is going to be done by a remote controlled system.
Final Deliverable of the Project Hardware SystemCore Industry HealthOther IndustriesCore Technology Clean TechOther TechnologiesSustainable Development Goals Good Health and Well-Being for People, Clean Water and Sanitation, Life Below WaterRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 47100 | |||
| Motor | Equipment | 2 | 2500 | 5000 |
| Aluminium rod | Equipment | 20 | 300 | 6000 |
| Hollow Pipes | Equipment | 2 | 1000 | 2000 |
| Propeller | Equipment | 1 | 2500 | 2500 |
| Gear | Equipment | 3 | 500 | 1500 |
| Welding and fabrication | Equipment | 1 | 5000 | 5000 |
| Sensors | Equipment | 2 | 1250 | 2500 |
| Chain | Miscellaneous | 2 | 800 | 1600 |
| Flappers | Equipment | 2 | 800 | 1600 |
| Bearings | Equipment | 6 | 900 | 5400 |
| Basket | Equipment | 1 | 1000 | 1000 |
| Base | Equipment | 1 | 600 | 600 |
| Conveyer | Equipment | 1 | 2000 | 2000 |
| others | Miscellaneous | 1 | 8000 | 8000 |
| Arduino Kit | Equipment | 2 | 1200 | 2400 |