Adil Khan 1 year ago
AdiKhanOfficial #FYP Ideas

Design & Development Of An Economic Gas Geyser

Pakistan will be facing a huge shortfall of 4,800 million cubic feet per day in local production of gas and its demand by fiscal year 2027-28. Gas Geyser have a many heat loses during operation due to which more natural gas/LPG required for it to work properly. For this reason ther

Project Title

Design & Development Of An Economic Gas Geyser

Project Area of Specialization

Mechanical Engineering

Project Summary

Pakistan will be facing a huge shortfall of 4,800 million cubic feet per day in local production of gas and its demand by fiscal year 2027-28. Gas Geyser have a many heat loses during operation due to which more natural gas/LPG required for it to work properly. For this reason there is a need of more efficient and also economical gas geyser which can help us to reduce energy crisis of world.

So for this reason a new design gas geyser was manufactured by installing hollow fins in the heat plate and vent of the gas geyser to reduce heat loss and which heat up the water more quickly by reaching at optimum temperature. So by doing this the consumption of gas was reduced and which help extremely in saving energy.

Project Objectives

  • To minimize the heat losses of a gas geyser and make it more economical. To analyze of heat losses of an existing gas geyser and arrest their heat losses.
  • To reduce the consumption of gas. Modification of an existing gas geyser with minimum heat losses using the hollow fins design in geyser.
  • Testing of the gas geyser to find out the efficiency and compare it with standard gas geysers. Comparison of cost of gas geyser to check its economical perspective.

Project Implementation Method

  • Literature Review.
  • Heat Loss Calculation.
  • Hollow Fin Calculation.
  • Design of Hollow Fin Installed in water tank of a gas geyser.
  • Prototype manufacturing.
  • Experimentation & Comparison of efficiency.
  • Formulation of a complete report of the project.

Benefits of the Project

  • Energy Saving
  • Time Saving
  • Minimized Heat Losses
  • Reduced Gas Consumption

Technical Details of Final Deliverable

  • Material Selection For Hollow Fins(Copper)
  • Increasing the rate of Heat Transfer

The gas geyser quickly heat up the water at cutoff or optimum temperature because of installation of hollow fins which is made up of a copper in the plate of water tank and in the vent of gas geyser due to the hollow fins the heat transfer rate was increased because contact area of water with hot surface increased. So in result time consumption was shortened due to this gas consumption was also decreased.

Final Deliverable of the Project

Hardware System

Core Industry

Energy

Other Industries

Core Technology

Others

Other Technologies

Sustainable Development Goals

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 0
If you need this project, please contact me on contact@adikhanofficial.com
0
139
IoT based automated surveillance system for smart cities

Due to advances in information technology (e.g., digital video cameras, ubiquitous sensors...

1675638330.png
Adil Khan
1 year ago
OCR Based Compiler for Java and C plus plus

The ?OCR (Optical Character Recognition)  based Compiler for Java and C++ using Andro...

1675638330.png
Adil Khan
1 year ago
E-Product Filtering System

Setting up a physical store is more difficult than setting up an online business, thus mor...

1675638330.png
Adil Khan
1 year ago
Smart Air Purifier

Purpose: This project's core purpose is to fulfill the FYP requirement to complete the deg...

1675638330.png
Adil Khan
1 year ago
vision based robotic arm

as we know the use of robots in industry increase day to day so that we are designing&nbsp...

1675638330.png
Adil Khan
1 year ago