Pakistan will be facing a huge shortfall of 4,800 million cubic feet per day in local production of gas and its demand by fiscal year 2027-28. Gas Geyser have a many heat loses during operation due to which more natural gas/LPG required for it to work properly. For this reason ther
Design & Development Of An Economic Gas Geyser
Pakistan will be facing a huge shortfall of 4,800 million cubic feet per day in local production of gas and its demand by fiscal year 2027-28. Gas Geyser have a many heat loses during operation due to which more natural gas/LPG required for it to work properly. For this reason there is a need of more efficient and also economical gas geyser which can help us to reduce energy crisis of world.
So for this reason a new design gas geyser was manufactured by installing hollow fins in the heat plate and vent of the gas geyser to reduce heat loss and which heat up the water more quickly by reaching at optimum temperature. So by doing this the consumption of gas was reduced and which help extremely in saving energy.
The gas geyser quickly heat up the water at cutoff or optimum temperature because of installation of hollow fins which is made up of a copper in the plate of water tank and in the vent of gas geyser due to the hollow fins the heat transfer rate was increased because contact area of water with hot surface increased. So in result time consumption was shortened due to this gas consumption was also decreased.
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 0 |
This work is to design and implement a Fire and gas Detection System, using SMS Feedback i...
This project addresses the issue for data sorting on FPGA. The project focuses on the...
This project is based on Android app For Nearest Masjid is to create a full-fledged androi...
The efficient energy management of the distribution system has been improved day by day bu...
...