Adil Khan 1 year ago
AdiKhanOfficial #FYP Ideas

Controlling and Monitoring of three phase induction motor with fault deduction through SCADA

Three phase induction motors are mostly used in industry for various operations. Here the implementation of monitoring system for 3-phase induction motor based on programable logic controller(PLC) & SCADA technology is described. Also the implementation of a hardware and software for speed contr

Project Title

Controlling and Monitoring of three phase induction motor with fault deduction through SCADA

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

Three phase induction motors are mostly used in industry for various operations. Here the implementation of monitoring system for 3-phase induction motor based on programable logic controller(PLC) & SCADA technology is described. Also the implementation of a hardware and software for speed control, direction control, parameter monitoring on SCADA screen is provided. VFD can also use to control the motor rotation direction and rotation speed of the three phase induction motor. All the required control and motor performance monitoring data will be taken to a personal computer by SCADA software via PLC for further analysis.

Project Objectives

1. It can be used specially for workplace employee to reduce hard work.

2. It can be useful for the records of machine progress and production.

3. Fault detection will be find easily.

4. It will be efficient to need the data and operate accordingly by your own choice.

Project Implementation Method

This method is very easy for implementation of this project, SCADA is basicaly like a supervisor that how to start motor and also the progress of machine, production etc.. PLC is commanding and VFD controls the speed , also in the end SCADA will monitor everything like motors speed, RPM, rotation etc..

Benefits of the Project

1. Helpful for the employer to be updated with labours work , also the progress of machine.

2. By using of IP address employer or engineer can access the system through their pc or any available device.

3.  Time saving and efficient monitoring system.

4.  Useful for continous monitoring. 

Technical Details of Final Deliverable

1. Use of SCADA helps us to make database as well as in communication between employee/employer and the production machine.

2. Data security.

3. Efficient system.

4. Its operation function is easily to be accessible

Final Deliverable of the Project

Hardware System

Core Industry

Others

Other Industries

IT

Core Technology

Others

Other Technologies

Internet of Things (IoT)

Sustainable Development Goals

Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
PLC Equipment11000010000
VFD Equipment11000010000
SCADA Equipment13500035000
CT Equipment115001500
Contactors, pannel etc Miscellaneous 11000010000
Total in (Rs) 66500
If you need this project, please contact me on contact@adikhanofficial.com
0
120
Soccer Robo Team

In this 21st century we are surrounded by robots.  Robotics play an important role in...

1675638330.png
Adil Khan
1 year ago
Metaverse virtual conference room

We are working on a metaverse virtual conference room where our avatars may communicate wi...

1675638330.png
Adil Khan
1 year ago
Drowsiness detection using EEG headset

    EEG (electroencephalography) is a process which is used to image the br...

1675638330.png
Adil Khan
1 year ago
Zero Energy Building

Zero energy building is a building with zero net energy consumption meaning the total amou...

1675638330.png
Adil Khan
1 year ago
Implementation of intelligent street lighting system

In developing countries most of the power which produced is consumed in lighting. Usually...

1675638330.png
Adil Khan
1 year ago