Controlling and monitoring of Power system using Arduino and Scada
The controlling and monitoring of power system. In overload condition the plant changes the generator and cut off the fault generation system This all cut off is automatic.We can also save extra energy by charging over batteries and use it when we needed.
2025-06-28 16:25:59 - Adil Khan
Controlling and monitoring of Power system using Arduino and Scada
Project Area of Specialization Electrical/Electronic EngineeringProject SummaryThe controlling and monitoring of power system. In overload condition the plant changes the generator and cut off the fault generation system
This all cut off is automatic.We can also save extra energy by charging over batteries and use it when we needed.
Project ObjectivesThe main objective of controlling the Grid station by automation from a long distance and also monitor of data. That how's our grid working if any fault occur it gives us signal from which we can increase the efficiency of maintenance and recover the fault before time.
Project Implementation Method1-Research
2-Schemetic
3-Software implement
4-coding
5-hardware implement
6-working of Project
Benefits of the ProjectA more sustainable tommorow starts today
Increase operational efficency with scada
Reduce network loading
Increase netword efficency
Our generators produce electricity which can be transmitted and distributed to over customers.All the data can be monitored online and also controlled. All the voltages produce and consume also show in the website of Scada.
Final Deliverable of the Project Hardware SystemCore Industry Energy Other IndustriesCore Technology OthersOther TechnologiesSustainable Development GoalsRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|