Adil Khan 1 year ago
AdiKhanOfficial #FYP Ideas

Civil Project Management System CPMS

  Project Implementation Method (less than 2500 characters)

Project Title

Civil Project Management System CPMS

Project Area of Specialization

Cloud Infrastructure

Project Summary

  • Online form filling systems are widely used in Pakistan.
  • Universities and other government organization use online form filling systems.
  • Data will be taken from applicant which will be then evaluated for project eligibility.
  • We will provide a software which will reduce the manual workload which save a lot of time in project management.

Project Objectives

  • To manage the detailed information of Projects, contractors, builders, releveant documents and Land details. 
  • Reducing manual workload and time.
  • Dashboards
  • Analysis and reporting

Project Implementation Method

Step 1: First generate forms where applicants will be able to fill their information.

Step 2: The data will be stored in the database and will get evaluated from different departments of Government agencies

Step 3: Then we will be sending feedback to the applicant.

Methodology

  • ERD
  • Algorithm
  • SQL
  • FORMS
  • Database
  • Testing & validation.

Benefits of the Project

CPMS to assist in the data management and to help organization ensure that it is equipped with the right level of information and details for future usage.

Technical Details of Final Deliverable

Online form filling systems for universities and other government organizations to take data from applicant and which will be then evaluated for their eligibility. The software which will help to manage projects and reduce the manual work load

Final Deliverable of the Project

Software System

Core Industry

IT

Other Industries

Core Technology

Big Data

Other Technologies

Sustainable Development Goals

Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
printing(documents, etc) Miscellaneous 196509650
SSD hard drive Equipment11650016500
Raspberry pi 4 Model B 8GB Equipment12090020900
monitor Equipment11680016800
connecting cable Equipment189708970
Total in (Rs) 72820
If you need this project, please contact me on contact@adikhanofficial.com
0
195
IOT based monitoring and controlling of a distribution transformer

This project is all about the protection of a distribution transformer under overload cond...

1675638330.png
Adil Khan
1 year ago
DTMF Controlled Robot without Microcontroller

In this project, I will show you how to design a simple Robotic vehicle that can be contro...

1675638330.png
Adil Khan
1 year ago
University Timetable Management System

University Timetable Management System is on the go web application of automated system wh...

1675638330.png
Adil Khan
1 year ago
LingMaster

Different domains, multiple fields, the dimension of this online world is enormous. We are...

1675638330.png
Adil Khan
1 year ago
Smart Location Base Services

Whenever we are travelling or go to some new place or need some service or product at our...

1675638330.png
Adil Khan
1 year ago