Project Implementation Method (less than 2500 characters)
Civil Project Management System CPMS
Step 1: First generate forms where applicants will be able to fill their information.
Step 2: The data will be stored in the database and will get evaluated from different departments of Government agencies
Step 3: Then we will be sending feedback to the applicant.
Methodology
CPMS to assist in the data management and to help organization ensure that it is equipped with the right level of information and details for future usage.
Online form filling systems for universities and other government organizations to take data from applicant and which will be then evaluated for their eligibility. The software which will help to manage projects and reduce the manual work load
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| printing(documents, etc) | Miscellaneous | 1 | 9650 | 9650 |
| SSD hard drive | Equipment | 1 | 16500 | 16500 |
| Raspberry pi 4 Model B 8GB | Equipment | 1 | 20900 | 20900 |
| monitor | Equipment | 1 | 16800 | 16800 |
| connecting cable | Equipment | 1 | 8970 | 8970 |
| Total in (Rs) | 72820 |
This project is all about the protection of a distribution transformer under overload cond...
In this project, I will show you how to design a simple Robotic vehicle that can be contro...
University Timetable Management System is on the go web application of automated system wh...
Different domains, multiple fields, the dimension of this online world is enormous. We are...
Whenever we are travelling or go to some new place or need some service or product at our...